CHANGE ORDER #1 TO MCM (S-16094)
Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-16094 for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The change order grants a 51-day non-compensable time extension due to a delay in permitting, revising the Substantial Completion date from March 21, 2026, to May 11, 2026, and the Final Completion date from April 20, 2026, to June 10, 2026. The project involves earthwork, paving, grading, pile foundation, roofing, HVAC, plumbing, fire pumps, electrical systems, and network infrastructure. The new facility will include 3,525 square feet of office space, warehousing, receiving areas, and outdoor storage canopies. It is designed to meet sea level rise guidelines, enhance operational resilience, and achieve LEED Silver Certification. The project's original award was $28,095,287.50. There are no stated public comments or stakeholder sentiment.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted (Resolution Ratifying Change Order No. 1)
- Address:
- Central District Wastewater Treatment Plant (CDWWTP)
- Applicant:
- Magnum Construction Management, LLC
CHANGE ORDER #1 TO MCM (S-16094)
Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-16094 with Magnum Construction Management, LLC. This change order grants a 51-day non-compensable time extension for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The extension is due to delays in obtaining a Class VI Permit. The project involves earthwork, paving, grading, a pile foundation system, structural roofing, HVAC, plumbing, fire pumps, electrical manholes, duct banks, switchgear, fiber patch panels, and a MIS Network Switch Cabinet. The new facility will be 3,525 square feet and is designed to meet sea level rise guidelines and LEED Silver Certification. The original contract award was $28,095,287.50. The Substantial Completion date is extended from March 21, 2026, to May 11, 2026, and the Final Completion date from April 20, 2026, to June 10, 2026. There are no small business enterprise measures, workforce, or responsible wage and benefits requirements for this project. No public comment was stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted (Resolution Ratifying Change Order No. 1)
- Address:
- Central District Wastewater Treatment Plant (CDWWTP)
- Applicant:
- Magnum Construction Management, LLC
CHANGE ORDER #1 TO MCM (S-16094)
Resolution ratifying Change Order No. 1 to Contract No. S-16094 between Miami-Dade County and Magnum Construction Management, LLC for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The change order grants a 51-day non-compensable time extension, revising the Substantial Completion date from March 21, 2026 to May 11, 2026 and the Final Completion date from April 20, 2026 to June 10, 2026. The project includes replacement of an existing storage building and warehouse to meet sea level rise guidelines and expansion of space to accommodate over 6,000 parts. The new facility will allow demolition of the existing storage building to make room for a new LEED Silver Certified Electrical Distribution Building No. 3. The project is located at WASD's CDWWTP in Commission District 7. The contract was awarded on October 3, 2024, ratified by the Board on June 26, 2025 via Resolution No. R-615-25. Total contract award was $28,095,287.50 with a Contingency Allowance of $1,987,250.00. Notice to Proceed was issued on January 20, 2025. A Stop Work Order was issued on March 3, 2025 due to delay in obtaining the Class VI Permit, lifted on April 18, 2025, and the Contractor remobilized on April 23, 2025. The change order was adopted by the Board of County Commissioners on June 16, 2026. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water & Sewer Department; Contractor: Magnum Construction Management, LLC
CHANGE ORDER #1 TO MCM (S-16094)
Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-16094 for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The change order grants a 51-day non-compensable time extension due to a delay in permitting, revising the Substantial Completion date from March 21, 2026, to May 11, 2026, and the Final Completion date from April 20, 2026, to June 10, 2026. The project involves earthwork, paving, grading, pile foundation, roofing, HVAC, plumbing, fire pumps, electrical systems, and network infrastructure. The new facility will include 3,525 square feet of office space, warehousing, receiving areas, and outdoor storage canopies. It is designed to meet sea level rise guidelines, enhance operational resilience, improve storage capacity, and achieve LEED Silver Certification. The relocation of this building will allow for the demolition of an existing facility to make way for a new Electrical Distribution Building No. 3. The original contract award was $28,095,287.50. There are no small business enterprise measures, workforce, or responsible wage and benefits requirements for this project.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted (Resolution Ratifying Change Order No. 1)
- Address:
- Central District Wastewater Treatment Plant (CDWWTP)
- Applicant:
- Magnum Construction Management, LLC
CHANGE ORDER #1 TO MCM (S-16094)
Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-16094 for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The change order grants a 51-day non-compensable time extension due to permitting delays, revising the Substantial Completion date from March 21, 2026, to May 11, 2026, and the Final Completion date from April 20, 2026, to June 10, 2026. The project involves earthwork, paving, grading, pile foundation, roofing, HVAC, plumbing, fire pumps, electrical systems, and network infrastructure, aiming for LEED Silver Certification. This upgrade is part of Miami-Dade Water and Sewer Department's (WASD) Capital Improvement Program to enhance resilience against sea level rise and extreme weather.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted (Resolution Ratifying Change Order No. 1)
- Address:
- Central District Wastewater Treatment Plant (CDWWTP)
- Applicant:
- Magnum Construction Management, LLC
CHANGE ORDER #1 TO MCM (S-16094)
Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-16094 with Magnum Construction Management, LLC. This change order grants a 51-day non-compensable time extension for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The extension is due to delays in obtaining a Class VI Permit, attributed to the specialized design and environmental sensitivity of the coastal location. The project involves earthwork, paving, grading, a pile foundation system, structural roofing, HVAC, plumbing, fire pumps, electrical components, and network infrastructure. The new facility will replace an existing storage building to accommodate over 6,000 parts and allow for the future construction of a new Electrical Distribution Building No. 3. The project aims for LEED Silver Certification. Public comment is not stated.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted (Resolution Ratifying Change Order No. 1)
- Address:
- Central District Wastewater Treatment Plant (CDWWTP)
- Applicant:
- Magnum Construction Management, LLC
CHANGE ORDER #1 TO MCM (S-16094)
Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-16094 for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The change order grants a 51-day non-compensable time extension due to permitting delays, revising the Substantial Completion date from March 21, 2026, to May 11, 2026, and the Final Completion date from April 20, 2026, to June 10, 2026. The project involves earthwork, paving, grading, a pile foundation system, structural roofing, HVAC, plumbing, fire pumps, electrical manholes, duct banks, switchgear, fiber patch panels, and a MIS Network Switch Cabinet. The facility is designed to meet sea level rise guidelines, improve storage capacity, and support sustainability goals, aiming for LEED Silver Certification. The relocation of this building will allow for the demolition of the existing facility to make space for a new Electrical Distribution Building No. 3. No small business enterprise measures, workforce, or responsible wage and benefits requirements are associated with this project. Public comment is not stated.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted (Resolution Ratifying Change Order No. 1)
- Address:
- Central District Wastewater Treatment Plant (CDWWTP)
- Applicant:
- Magnum Construction Management, LLC
CHANGE ORDER #1 TO MCM (S-16094)
Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-16094 for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The change order grants a 51-day non-compensable time extension due to a delay in permitting, revising the Substantial Completion date from March 21, 2026, to May 11, 2026, and the Final Completion date from April 20, 2026, to June 10, 2026. The project involves earthwork, paving, grading, a pile foundation system, structural roofing, HVAC, plumbing, fire pumps, electrical manholes, duct banks, switchgear, fiber patch panels, and a MIS Network Switch Cabinet. The new facility will be 3,525 square feet and achieve LEED Silver Certification. This upgrade is part of Miami-Dade Water and Sewer Department's (WASD) Capital Improvement Program to enhance resilience against sea level rise and extreme weather. No small business enterprise measures are included.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted (Resolution Ratifying Action)
- Address:
- Central District Wastewater Treatment Plant (CDWWTP)
- Applicant:
- Magnum Construction Management, LLC
CHANGE ORDER #1 TO MCM (S-16094)
Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-16094 with Magnum Construction Management, LLC. This change order grants a 51-day non-compensable time extension for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The extension is due to delays in obtaining a Class VI Permit, attributed to the specialized design and environmental sensitivity of the coastal location. The project involves earthwork, paving, grading, a pile foundation system, structural roofing, HVAC, plumbing, fire pumps, electrical components, and network infrastructure. The new facility will be 3,525 square feet and is designed to meet sea level rise guidelines and achieve LEED Silver Certification. This upgrade will allow for the demolition of an existing storage building to make way for a new Electrical Distribution Building No. 3. The original contract award was $28,095,287.50. The Substantial Completion Date is revised from March 21, 2026, to May 11, 2026, and the Final Completion Date from April 20, 2026, to June 10, 2026. There is no additional fiscal impact to the County. The project is located at the CDWWTP in Commission District 7.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted (Resolution Ratifying Change Order No. 1)
- Address:
- Central District Wastewater Treatment Plant (CDWWTP)
- Applicant:
- Magnum Construction Management, LLC
CHANGE ORDER #1 TO MCM (S-16094)
Resolution R-537-26, File Number 260991, adopted by the Miami-Dade Board of County Commissioners on 6/16/2026, ratifies Change Order No. 1 to Contract No. S-16094 between Miami-Dade County and Magnum Construction Management, LLC for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The change order grants a 51-day non-compensable time extension, revising the Substantial Completion date from March 21, 2026 to May 11, 2026 and the Final Completion date from April 20, 2026 to June 10, 2026. The project is located at WASD's CDWWTP in Commission District 7. The total contract award was $28,095,287.50 with a Contingency Allowance of $1,987,250.00. The new building will provide 3,525 square feet of office space, warehousing, receiving areas, a second-floor storage area, and two outdoor storage canopies. The project includes replacement of an existing storage building and warehouse to meet sea level rise guidelines and expansion to accommodate over 6,000 parts. The new facility will allow demolition of the existing storage building to make room for a new LEED Silver Certified Electrical Distribution Building No. 3. The change order has no additional fiscal impact. The time extension was due to a delay in obtaining the Class VI Permit, which caused a Stop Work Order from March 3, 2025 to April 18, 2025. The contractor remobilized on April 23, 2025. The contract was awarded on October 3, 2024, ratified by the Board on June 26, 2025 via Resolution No. R-615-25, and the Notice to Proceed was issued on January 20, 2025.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water & Sewer Department; Contractor: Magnum Construction Management, LLC
CHANGE ORDER #1 TO MCM (S-16094)
Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-16094 with Magnum Construction Management, LLC. This change order grants a 51-day non-compensable time extension for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The extension is due to delays in obtaining a Class VI Permit. The project involves earthwork, paving, grading, pile foundation, roofing, HVAC, plumbing, fire pumps, electrical systems, and network infrastructure. The new facility will be 3,525 square feet and is designed to meet sea level rise guidelines and achieve LEED Silver Certification. This project will allow for the demolition of an existing storage building to make way for a new Electrical Distribution Building No. 3. The original contract award was $28,095,287.50. The Substantial Completion date is extended from March 21, 2026, to May 11, 2026, and the Final Completion date from April 20, 2026, to June 10, 2026.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted (Resolution Ratifying Change Order)
- Address:
- Central District Wastewater Treatment Plant (CDWWTP)
- Applicant:
- Miami-Dade Water and Sewer Department (WASD)
CHANGE ORDER #1 TO MCM (S-16094)
Resolution R-537-26, File Number 260991, adopted June 16, 2026, ratifies Change Order No. 1 to Contract No. S-16094 between Miami-Dade County and Magnum Construction Management, LLC for the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The change order grants a 51-day non-compensable time extension, moving the Substantial Completion date from March 21, 2026 to May 11, 2026 and the Final Completion date from April 20, 2026 to June 10, 2026. The project includes a 3,525 square foot building with office space, warehousing, receiving areas, second-floor storage, and two outdoor storage canopies, plus earthwork, paving, grading, pile foundation, structural roofing, HVAC, plumbing, fire pumps, electrical manholes, duct banks, switchgear, fiber patch panels, and a MIS Network Switch Cabinet. The facility will achieve LEED Silver Certification. The contract was awarded October 3, 2024, ratified June 26, 2025 via Resolution R-615-25, with a total award of $28,095,287.50 and a Contingency Allowance of $1,987,250.00. Notice to Proceed was issued January 20, 2025. A Stop Work Order was issued March 3, 2025 due to delay in obtaining the Class VI Permit, lifted April 18, 2025, and the contractor remobilized April 23, 2025. The time extension is due to the permitting delay. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water & Sewer Department; Contractor: Magnum Construction Management, LLC
CHANGE ORDER #1 TO MCM (S-16094)
Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-16094 with Magnum Construction Management, LLC. This change order grants a 51-day non-compensable time extension for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The extension is due to a delay in obtaining a Class VI Permit, attributed to the specialized design and environmental sensitivity of the coastal location. The project involves earthwork, paving, grading, a pile foundation system, structural roofing, HVAC, plumbing, fire pumps, electrical systems, and network infrastructure. The new facility will be 3,525 square feet and is designed to meet sea level rise guidelines and achieve LEED Silver Certification. The original contract award was $28,095,287.50. The Substantial Completion date is extended from March 21, 2026, to May 11, 2026, and the Final Completion date from April 20, 2026, to June 10, 2026. There is no additional fiscal impact to the County. The project is part of Miami-Dade Water and Sewer Department's $8.6 billion Capital Improvement Program.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted (Resolution Ratifying Change Order No. 1)
- Address:
- Central District Wastewater Treatment Plant (CDWWTP)
- Applicant:
- Magnum Construction Management, LLC
CHANGE ORDER #1 TO MCM (S-16094)
Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-16094 for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The change order grants a 51-day non-compensable time extension due to permitting delays, revising the Substantial Completion date from March 21, 2026, to May 11, 2026, and the Final Completion date from April 20, 2026, to June 10, 2026. The project involves earthwork, paving, grading, pile foundation, roofing, HVAC, plumbing, fire pumps, electrical systems, and network infrastructure, aiming for LEED Silver Certification. This upgrade is part of the $8.6 billion Capital Improvement Program to enhance resilience against sea level rise and extreme weather. The original contract award was $28,095,287.50.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted (Resolution Ratifying Change Order No. 1)
- Address:
- Central District Wastewater Treatment Plant (CDWWTP)
- Applicant:
- Magnum Construction Management, LLC
CHANGE ORDER #1 TO MCM (S-16094)
Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-16094 for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The change order grants a 51-day non-compensable time extension due to permitting delays. The project involves replacing an existing storage building and warehouse to meet sea level rise guidelines and expanding space for materials management. This upgrade is part of Miami-Dade Water and Sewer Department's (WASD) Capital Improvement Program to enhance infrastructure resilience against storm surges, flooding, and sea level rise. The new facility will allow for the demolition of the current storage building to make way for a new LEED Silver Certified Electrical Distribution Building No. 3. The original contract award was $28,095,287.50. The change order revises the Substantial Completion date from March 21, 2026, to May 11, 2026, and the Final Completion date from April 20, 2026, to June 10, 2026. No small business enterprise measures, workforce, or responsible wage and benefits requirements are associated with this project.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted (Resolution Ratifying Change Order No. 1)
- Address:
- Central District Wastewater Treatment Plant (CDWWTP)
- Applicant:
- Magnum Construction Management, LLC
CHANGE ORDER #1 TO MCM (S-16094)
Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-16094 with Magnum Construction Management, LLC. This change order grants a 51-day non-compensable time extension for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The extension is due to delays in obtaining a Class VI Permit, attributed to the specialized design and environmental sensitivity of the site. The project involves earthwork, paving, grading, pile foundation, roofing, HVAC, plumbing, fire pumps, electrical systems, and network infrastructure. The new facility will include 3,525 square feet of office and warehousing space, plus outdoor storage. It is designed to meet sea level rise guidelines, enhance operational resilience, and achieve LEED Silver Certification. The project's Substantial Completion date is extended from March 21, 2026, to May 11, 2026, and the Final Completion date from April 20, 2026, to June 10, 2026. This change order has no additional fiscal impact. The project was previously ratified by the Board on June 26, 2025, via Resolution No. R-615-25, with a total contract award of $28,095,287.50.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted (Resolution Ratifying Action)
- Address:
- Central District Wastewater Treatment Plant (CDWWTP)
- Applicant:
- Miami-Dade Water and Sewer Department (WASD)
CHANGE ORDER #1 TO MCM (S-16094)
Resolution R-537-26 ratifies Change Order No. 1 to Contract No. S-16094 between Miami-Dade County and Magnum Construction Management, LLC for the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The change order grants a 51-day non-compensable time extension, revising the Substantial Completion date from March 21, 2026 to May 11, 2026 and the Final Completion date from April 20, 2026 to June 10, 2026. The project includes 3,525 square feet of office space, warehousing, receiving areas, a second-floor storage area, and two outdoor storage canopies. The contract was awarded on October 3, 2024, with a total award of $28,095,287.50 and a Contingency Allowance of $1,987,250.00. The Notice to Proceed was issued on January 20, 2025. A Stop Work Order was issued on March 3, 2025 due to a delay in obtaining the required Class VI Permit, lifted on April 18, 2025, and the Contractor remobilized on April 23, 2025. The decision was Adopted on June 16, 2026. The project is located in Commission District 7, represented by Commissioner Raquel A. Regalado. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted
- Applicant:
- Miami-Dade County Water & Sewer Department; Contractor: Magnum Construction Management, LLC
CHANGE ORDER #1 TO MCM (S-16094)
Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-16094 with Magnum Construction Management, LLC, for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. This change order grants a 51-day non-compensable time extension due to permitting delays, revising the Substantial Completion date to May 11, 2026, and the Final Completion date to June 10, 2026. The project involves earthwork, paving, grading, a pile foundation system, structural roofing, HVAC, plumbing, fire pumps, electrical components, and network infrastructure. The new facility will be 3,525 square feet and is designed to meet sea level rise guidelines and achieve LEED Silver Certification. This upgrade also allows for the demolition of an existing storage building to make way for a new Electrical Distribution Building No. 3. The original contract award was $28,095,287.50. There are no small business enterprise measures, workforce, or responsible wage and benefits requirements for this project. Public comment is not stated.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted (Resolution Ratifying Change Order No. 1)
- Address:
- Central District Wastewater Treatment Plant (CDWWTP)
- Applicant:
- Magnum Construction Management, LLC
CHANGE ORDER #1 TO MCM (S-16094)
Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-16094 with Magnum Construction Management, LLC. This change order grants a 51-day non-compensable time extension for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The extension is due to delays in obtaining a Class VI Permit, influenced by the specialized design and environmental sensitivity of the coastal location. The project involves earthwork, paving, grading, a pile foundation system, structural roofing, HVAC, plumbing, fire pumps, electrical components, and network infrastructure. The new facility will replace an existing storage building to accommodate over 6,000 parts and allow for the future construction of a new Electrical Distribution Building No. 3. The project aims for LEED Silver Certification. Public comment is not stated.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted (Resolution Ratifying Change Order No. 1)
- Address:
- Central District Wastewater Treatment Plant (CDWWTP)
- Applicant:
- Magnum Construction Management, LLC
CHANGE ORDER #1 TO MCM (S-16094)
Miami-Dade County Board of County Commissioners ratified Change Order No. 1 to Contract No. S-16094 for the construction of the Central District Wastewater Treatment Plant (CDWWTP) New Materials Management Building and Storage Areas. The change order grants a 51-day non-compensable time extension due to a delay in permitting, revising the Substantial Completion date from March 21, 2026, to May 11, 2026, and the Final Completion date from April 20, 2026, to June 10, 2026. The project involves earthwork, paving, grading, a pile foundation system, structural roofing, HVAC, plumbing, fire pumps, electrical manholes, duct banks, switchgear, fiber patch panels, and a MIS Network Switch Cabinet. The new facility will be 3,525 square feet and achieve LEED Silver Certification. This upgrade is part of Miami-Dade Water and Sewer Department's (WASD) Capital Improvement Program to enhance resilience against sea level rise and extreme weather.
- Board:
- Board of County Commissioners
- Date:
- 2026-06-16
- Type:
- Resolution
- Decision:
- Adopted (Resolution Ratifying Change Order No. 1)
- Address:
- Central District Wastewater Treatment Plant (CDWWTP)
- Applicant:
- Miami-Dade Water and Sewer Department (WASD) / Magnum Construction Management, LLC