B) Deliverables:

April 21, 2026 City Council Regular Session · 2026-04-21 · agenda_item

The City of Mount Dora is planning to protect Wastewater Treatment Plant #1 Office Building by installing a generator. This project involves providing a generator, sized at approximately 30-kW or as determined by a vendor and electrical engineer, along with an automatic transfer switch, a 120-gallon fuel tank, and a new concrete pad. The generator and its components must be protected from 500-year flood events and high winds, meeting National Flood Insurance Program and ASCE 7 standards. The project is currently under review. Work will likely involve site preparation for the concrete pad, installation of the generator and fuel tank, electrical wiring and connection of the automatic transfer switch, and potentially the construction of a protective enclosure. Contractors specializing in electrical work, concrete installation, and potentially general contracting for site preparation and enclosure construction could find opportunities. Suppliers of generators, fuel tanks, and electrical components may also be involved. Early engagement is advised as project details are still being finalized before bids and permits are issued.

generator size
30 kW
fuel tank size
120 gallon
flood event protection
500 year

Industries that could win this work

  • Electrical
  • Concrete & Masonry
  • General Contractor
  • Building & Industrial Supply
  • Engineering & Architecture