April 29, 2026_Historic Preservation Board Meeting_Agenda
April 29, 2026 Historic Preservation Board · 2026-04-29 · agenda
[110 N Clayton Street, 115 W 3rd Avenue, 729 E. 8th Ave, 351 W 10th Street, 606 N McDonald Street] The Historic Preservation Board agenda for April 29, 2026, includes five Certificates of Appropriateness for exterior work. Project at 110 N Clayton Street involves a new garage. Project at 115 W 3rd Avenue is a renovation. Project at 729 E. 8th Ave for window replacement was tabled. Project at 351 W 10th Street is for window renovation. Project at 606 N McDonald Street is for an addition. Public comment is scheduled for each item, but no decisions or specific public sentiment are detailed in this agenda.
Agenda items
- 1. Accept Staff’s Findings of Fact and Approve the application, as presented;
- 1. Accept Staff’s Findings of Fact and Approve the application, as presented;
- 1. Accept Staff’s Findings of Fact and Approve the application, as presented;
- Legal Services
- Engineering & Architecture
- 1. Basic requirements.
- 1. Construct a 784 SF , concrete block addition with architectural shingles , windows with
- General Contractor
- Concrete & Masonry
- Roofing
- Painting & Flooring
- Windows, Doors & Glass
- Building & Industrial Supply
- 1. Construct a 784 SF , concrete block addition with architectural shingles , windows with
- General Contractor
- Concrete & Masonry
- Roofing
- Windows, Doors & Glass
- Painting & Flooring
- Building & Industrial Supply
- 1. Height. The height of proposed buildings or modifications will be visually compatible in
- General Contractor
- Engineering & Architecture
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Landscaping & Lawn Service
- Signage & Printing
- 1. Historic site. No building, structure, appurtenance, improvement
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- Landscaping & Lawn Service
- Government Authority
- 1. Located within the city, there are archaeological sites, buildings, structures, 4
- Engineering & Architecture
- Legal Services
- Construction (Other)
- Landscaping & Lawn Service
- Building & Industrial Supply
- Appraisal & Inspection
- 1. Porch Additions: Porches should not be added to a primary façade if the building did not
- Carpentry & Cabinetry
- Construction (Other)
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. The new metal roof shall be standing seam with concealed fastener in an earthy or muted
- Roofing
- 1. The request is consistent with the Mount Dora Historic Design Standards which state that
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. The request is consistent with the Mount Dora Historic Design Standards which state that
- 1. The subject residence was constructed in 1954 and a two-story addition was added in 2007;
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Windows, Doors & Glass
- Engineering & Architecture
- Appraisal & Inspection
- Landscaping & Lawn Service
- Building & Industrial Supply
- 10. Scale of building. The size of a building, the building mass in relation to open spaces,
- 10. Traditional Materials: The continued use of traditional materials such as wood, stone,
- Concrete & Masonry
- Carpentry & Cabinetry
- Painting & Flooring
- Restoration & Waterproofing
- Construction (Other)
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Design & Creative
- Landscaping & Lawn Service
- 11. Directional expression of front elevation. A building will be visually compatible with the
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Appraisal & Inspection
- 11. Roof Materials: Select roof materials that are similar in type, pattern, form, texture, and
- 12. Metal Roofs: New metal roofing is acceptable provided that the new metal roof is metal
- Roofing
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- 13. Entrance Porches: Entrance porches and porticos of various configurations are present
- Carpentry & Cabinetry
- Concrete & Masonry
- Construction (Other)
- Painting & Flooring
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 14. Window Expression and Placement : Windows attract the eye, so it is important to
- 15. Porches: The incorporation of porches in new construction is encouraged. Design should
- 16. Primary Entrances: Preserve and retain the primary entrances of buildings in their historic
- 17. Secondary Entrances : Preserve and retain secondary entrances on the side or rear of
- Carpentry & Cabinetry
- Concrete & Masonry
- Painting & Flooring
- Restoration & Waterproofing
- Engineering & Architecture
- Legal Services
- Appraisal & Inspection
- 18. Closing Historic Entrances : Do not remove, close, or fill in historic entrances, as this
- 19. New Entrances: New entrances should be located on the side or rear façades in locations
- Carpentry & Cabinetry
- Concrete & Masonry
- General Contractor
- Restoration & Waterproofing
- Engineering & Architecture
- 2. Add a 196 SF front porch with a metal roof and 6’X6’ pressure treated posts over the
- Carpentry & Cabinetry
- Concrete & Masonry
- Roofing
- Building & Industrial Supply
- Landscaping & Lawn Service
- 2. Add a 196 SF front porch with a metal roof and 6’X6’ pressure treated posts over the
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Roofing
- Building & Industrial Supply
- Landscaping & Lawn Service
- 2. Building Orientation: New construction should have a similar orientation and relationship
- 2. Front facade proportion. The front facade of each building or structure will be visually
- Engineering & Architecture
- General Contractor
- Carpentry & Cabinetry
- Painting & Flooring
- Restoration & Waterproofing
- Windows, Doors & Glass
- Real Estate Development
- 2. Historic preservation review area. A certificate of appropriateness
- 2. Partially reject Staff’s Findings of Fact and Approve the application with conditions to
- 2. Partially reject Staff’s Findings of Fact and Approve the application with conditions to
- 2. Partially reject Staff’s Findings of Fact and Approve the application with conditions to
- 2. The 2008 Site Survey stated that the resource has lost much of its historic integrity and
- 2. The request is consistent with the Mount Dora Historic Design Standards which
- 2. The request is consistent with the Mount Dora Historic Design Standards which state
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Electrical
- Painting & Flooring
- Building & Industrial Supply
- 2. The windows on western façade include the sh utters and grid lines depicted in the
- 2. Through this and other dedicated efforts of local public and private groups and 11
- 20. Later Windows: Windows that have been added through subsequent historic periods can
- 21. Window Openings: Avoid enlarging, reducing, or filling in historic window openings.
- 22. Shutter Installation : The installation of historically appropriate shutters on historic
- General Contractor
- Carpentry & Cabinetry
- Painting & Flooring
- Windows, Doors & Glass
- Engineering & Architecture
- Real Estate Development
- 23. Shutter Size and Configuration: New shutters should match the height and width of the
- 24. Shutter Materials and Design: Shutters may be wood or a composite material and should
- Carpentry & Cabinetry
- Painting & Flooring
- Construction (Other)
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 25. Inappropriate Shutter Locations: Shutters should not be installed on windows that would
- 26. New Windows : New windows should not be introduced to any primary façade. New
- 27. New Window Design : The type, size, placement, and detailing of new windows on
- Windows, Doors & Glass
- Carpentry & Cabinetry
- Painting & Flooring
- Restoration & Waterproofing
- Engineering & Architecture
- 3. Close in and reconfigure the window openings on the western façade in the entrance area;
- 3. Close in and reconfigure the window openings on the western façade in the entrance area;
- Carpentry & Cabinetry
- Windows, Doors & Glass
- 3. Entrance Orientation : Primary entrances of new buildings should be on the primary
- 3. Proportion of openings (windows and doors). The openings of any building within a
- Engineering & Architecture
- General Contractor
- Carpentry & Cabinetry
- Windows, Doors & Glass
- Painting & Flooring
- Real Estate Development
- 3. Reject Staff’s Findings of Fact and Deny the application based on inconsistencies between
- Legal Services
- Engineering & Architecture
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- 3. Reject Staff’s Findings of Fact and Deny the application based on inconsistencies between
- Windows, Doors & Glass
- Carpentry & Cabinetry
- Restoration & Waterproofing
- Engineering & Architecture
- 3. Reject Staff’s Findings of Fact and Deny the application based on inconsistencies between
- Legal Services
- Engineering & Architecture
- 3. The proposed changes are compatible with the existing residence, utilizes the same façade
- General Contractor
- Carpentry & Cabinetry
- Painting & Flooring
- Windows, Doors & Glass
- Engineering & Architecture
- 3. The proposed work is compatible with the architectural style of the building; and
- 3. The request is promotes visual compatibility with the exterior architectural of adjacent,
- Construction (Other)
- Engineering & Architecture
- Appraisal & Inspection
- 4. Close in and relocate one of the front entrances to the proposed addition;
- 4. Close in and relocate one of the front entrances to the proposed addition;
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 4. Rhythm of solids to voids —Front facades. The relationship of solids to voids in the front
- Engineering & Architecture
- General Contractor
- Carpentry & Cabinetry
- Painting & Flooring
- Drywall & Insulation
- Windows, Doors & Glass
- Roofing
- Concrete & Masonry
- Lighting & Low-Voltage Systems
- Construction (Other)
- 4. Setbacks: Where there are established and consistent setbacks, setbacks of new
- 4. The request is promotes visual compatibility with the exterior architectural of adjacent,
- Construction (Other)
- Engineering & Architecture
- Legal Services
- Real Estate Development
- 4. The request promotes visual compatibility with the exterior architectural of adjacent,
- 5. Enclose and reconfigure window and door openings on eastern façade (rear of the house);
- 5. Enclose and reconfigure window and door openings on eastern façade (rear of the house);
- Carpentry & Cabinetry
- Windows, Doors & Glass
- General Contractor
- Building & Industrial Supply
- 5. Rhythm of buildings on streets. The relationship of building(s) to open space between it or
- Engineering & Architecture
- Business Consulting
- Design & Creative
- 5. Size Location of Additions : Additions should be located on the side or rear elevation as
- 6. Add a window on the second story of the northern façade (side of house); and
- 6. Add a window on the second story of the northern façade (side of house); and
- 6. Complementary Expression : New construction should take inspiration from and be
- 6. Rhythm of entrance and/or porch projections. The relationship of entrances and porch
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 7. Compatible New Design: New construction and additions can utilize modern technologies
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 7. Relationship to materials and texture. The relationship of materials and texture of the
- 7. Stucco the block home and proposed addition.
- 7. Stucco the block home and proposed addition.
- Concrete & Masonry
- General Contractor
- Painting & Flooring
- Site Prep, Grading & Hardscape
- 8. Proportion of Additions: Additions should be subordinate to, and not overwhelm, the
- 8. Roof shapes. The roof shape of a building or structure will be visually compatible with the
- 9. Solids-to-Voids Proportions: The rhythm and pattern of fenestration (the arrangement
- 9. Walls of continuity. Appearances of a building or structure such as walls, wrought -iron
- A. 610 N. Tremain Street - Reroof
- Roofing
- Building & Industrial Supply
- B. 1148 N. Grandview Street - Reroof
- Roofing
- C. 811 N. Grandview Street – Window/Door Renovation
- Carpentry & Cabinetry
- Painting & Flooring
- Restoration & Waterproofing
- Windows, Doors & Glass
- Engineering & Architecture
- Appraisal & Inspection
- Cc: Scott, Whitney
- Engineering & Architecture
- Real Estate Development
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Windows, Doors & Glass
- Building & Industrial Supply
- Landscaping & Lawn Service
- D. 729 E. 8th Avenue – Window Replacement
- Windows, Doors & Glass
- Carpentry & Cabinetry
- Painting & Flooring
- Construction (Other)
- E: willist@mountdora.gov (Email)
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- IX. Announcement of next scheduled meeting date; May 27, 2026 @ 3:00 p.m.
- IX. Announcement of next scheduled meeting date; May 27, 2026 @ 3:00 p.m.
- N. Baker St.
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- N. Baker St.
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- T: (352) 735-7112 Ext. 1709 (Office)
- V. CERTIFICATE OF APPROPRIATENESS
- V. Certificate of Appropriateness
- V. Certificate of Appropriateness
- VII. OTHER BUSINESS
- VIII. ANNOUNCEMENT OF NEXT SCHEDULED MEETING DATE: April 29, 2026 (3:00pm)
- a. 110 N Clayton Street - New Garage
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- a. 110 N Clayton Street - New Garage
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Appraisal & Inspection
- Engineering & Architecture
- a. Certificate of appropriateness required.
- a. Fifty years old or older; or
- a. General Layout: Retain historic property line patterns, street relationships, setbacks,
- Engineering & Architecture
- Landscaping & Lawn Service
- Site Prep, Grading & Hardscape
- a. Historic Ordinance Update
- a. Historic Ordinance Update
- a. Retain Historic Frames: When possible, replace only the sash, leaving the historic frame
- Carpentry & Cabinetry
- Windows, Doors & Glass
- Building & Industrial Supply
- b. 115 W 3rd Avenue - Renovation
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Restoration & Waterproofing
- Roofing
- Site Prep, Grading & Hardscape
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- b. 115 W 3rd Avenue - Renovation
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Restoration & Waterproofing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Cleaning & Janitorial
- b. Demolition by Neglect
- b. Demolition by Neglect
- b. New additions or when a structure is erected construction.
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- b. Size Location of Additions: Additions should be located on the side or rear elevation as
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- b. Window Size: New windows should be fabricated to match the full size of the historic
- c. 351 W 10th Street - Window Renovation
- Construction (Other)
- Windows, Doors & Glass
- Engineering & Architecture
- Legal Services
- Appraisal & Inspection
- c. 729 E. 8th Ave- Window Replacement (Tabled)
- Windows, Doors & Glass
- c. Compatible New Design: New construction and additions can utilize modern technologies
- c. Vinyl as Special Exceptions: For new construction, accessory buildings, rear additions to
- Windows, Doors & Glass
- General Contractor
- Engineering & Architecture
- d. 351 W 10th Street - Window Renovation
- General Contractor
- Carpentry & Cabinetry
- Painting & Flooring
- Restoration & Waterproofing
- Engineering & Architecture
- Business Consulting
- Appraisal & Inspection
- d. 606 N McDonald Street Addition
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- d. Dormer Windows: Windows should complement the character of the historic windows,
- d. Proportion of Additions: Additions should be subordinate to, and not overwhelm, the
- e. 606 N McDonald Street Addition
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- e. Compatibility: Materials should be of a complementary type, size, texture, color and level
- e. Preservation: Preserve, repair, and maintain historic porches associated with buildings in
- Carpentry & Cabinetry
- Concrete & Masonry
- Painting & Flooring
- Restoration & Waterproofing
- Engineering & Architecture
- Landscaping & Lawn Service
- f. Enclosing Original Porches: Historic porches should not be enclosed with walls and/or
- f. Inappropriate Materials: The use of vinyl and aluminum siding, unpainted wood,
- Carpentry & Cabinetry
- Painting & Flooring
- Restoration & Waterproofing
- Construction (Other)
- Building & Industrial Supply
- Appraisal & Inspection
- Engineering & Architecture
- Legal Services
- Cleaning & Janitorial
- Landscaping & Lawn Service
- Signage & Printing
- g. Limited Enclosures: On secondary or rear elevations, porch enclosures may be permitted
- Carpentry & Cabinetry
- Painting & Flooring
- Restoration & Waterproofing
- Engineering & Architecture
- Appraisal & Inspection
- g. Porches: The incorporation of porches in new construction is encouraged. Design should
- Carpentry & Cabinetry
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- iv. Applicant Presentation
- v. Discussion
- General Contractor
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- v. Discussion
- Roofing
- v. Discussion
- Windows, Doors & Glass
- Carpentry & Cabinetry
- General Contractor
- v. Discussion
- General Contractor
- Carpentry & Cabinetry
- Windows, Doors & Glass
- Building & Industrial Supply
Follow this across meetings
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account