f. Construction Requirements : During the construction phases of the Roadway
Planning Commission · 2026-05-07 · agenda_item
This item concerns construction requirements for planned Roadway Improvements. The developer will be responsible for overseeing all construction activities, ensuring they meet county plans and specifications. This includes on-site inspection by a Florida-registered professional engineer, obtaining necessary permits, and supervising all work. Independent laboratory testing of roads, stormwater drainage, and utilities will be required, with failed tests reported immediately to the County Engineer. A professional engineer must also certify that all designs, permits, and construction conform to county standards. The developer must submit design drawings, as-built drawings, and permit close-outs to the County. This project is currently under review, indicating an early stage in the development process. The scope of work will likely involve site preparation, grading, utility installation, road paving, and final inspections. Local contractors, suppliers, and service providers in site prep, grading, concrete, paving, utility work, engineering, and testing services may find opportunities. Engaging early, before final plans and bids are set, offers a chance to compete for this upcoming work.
Industries that could win this work
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Electrical
- Plumbing
- HVAC & Climate Control
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- Accounting & Tax
- Waste Management
Follow this across meetings
Board
Planning CommissionSee the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account