Skip to main content

Be First, Build Lasting Relationships

Browse Santa Rosa County civic records

Every published record for Santa Rosa County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.

1,842 records

7) Commissioner Burkett - Proposed Tunnel Road Improvements

Santa Rosa County staff are being directed to begin developing improvements for the Tunnel Road and Quintette Road intersection. This project is currently under review, meaning it is in the early stages of planning. The work would likely involve site clearing, grading, and potentially underground utility work, followed by paving and road construction. Contractors specializing in site preparation, grading, concrete, paving, and general construction could find opportunities. Reaching out to county staff early in this planning phase may provide an advantage before detailed site plans, bids, and permits are finalized.

Board:
Commission Committee Meeting
Date:
2026-05-19
Type:
Agenda_item
Address:
Tunnel Road / Quintette Road intersection

7) County Attorney- "Remnant Defendants" Opioid Settlement

This item concerns a planned opioid settlement participation form for Santa Rosa County. The County Attorney's office is seeking approval for the county to join a settlement related to national opioid litigation. This action is currently under review by the Commission Committee. If approved, the county chairman will be authorized to sign all necessary documents. This process involves legal review and authorization, with potential future implications for how the county addresses opioid-related issues. The primary opportunity lies in legal services related to settlement agreements and potential future legal actions or programs stemming from the settlement funds.

Board:
Commission Committee Meeting
Date:
2026-05-19
Type:
Agenda_item

7) Engineering - Hwy 182 Widening and Resurfacing (LAP) and Budget Amendment 2026-047

Santa Rosa County is planning the Highway 182 Widening and Resurfacing project. This project is currently under review. The county is considering approval of a task order for construction, engineering, and inspection services. This work would involve planning and oversight for the widening and resurfacing of Highway 182. Local contractors, trades, suppliers, and service providers are encouraged to learn more about this project as it moves through the review process. Early engagement before final plans and bids are set could provide a competitive advantage.

Board:
Commission Committee Meeting
Date:
2026-05-19
Type:
Agenda_item
Address:
Highway 182

7) Public Works - RR Crossing Signal Upgrades Agreements

Santa Rosa County is considering two agreements for railroad crossing signal upgrades. These agreements are between Santa Rosa County, FDOT, and Florida Gulf and Atlantic Railroad, LLC. The proposed improvements are planned for railroad crossings located at Industrial Blvd. and Deaton Bridge Road. This item is currently under review by the Commission Committee. If approved, the project would involve work related to railroad signal systems and potentially related infrastructure. Contractors and suppliers involved in electrical systems, signal installation, and potentially civil work near railroad tracks could find opportunities. Engaging with the county early could provide an advantage before specific bid processes begin.

Board:
Commission Committee Meeting
Date:
2026-05-19
Type:
Agenda_item
Address:
Industrial Blvd.
Applicant:
Santa Rosa County

7) Public Works - RR Crossing Signal Upgrades Agreements

Santa Rosa County is considering agreements for railroad crossing signal upgrades at two locations: Industrial Blvd. and Deaton Bridge Road. These agreements, if approved, would involve Santa Rosa County, the Florida Department of Transportation (FDOT), and Florida Gulf and Atlantic Railroad, LLC. The project is currently under review by the Commission Committee. Work would likely involve coordination with railroad companies, potential site preparation, installation of new signal equipment, and related electrical and civil work. Contractors specializing in railroad infrastructure, electrical systems, and civil engineering could find opportunities as this project moves forward. Early engagement is advised before final plans and permits are established.

Board:
Commission Committee Meeting
Date:
2026-05-19
Type:
Agenda_item
Address:
Industrial Blvd.
Applicant:
Santa Rosa County

7. 2026-6-RSS

Santa Rosa County is reviewing a proposal to change the zoning and future land use for approximately 40 acres located at 4351 Berryhill Road in Pace. The property is currently zoned AGRR (Rural Residential Agriculture) and has an AGRR Future Land Use designation. The proposal seeks to rezone the land to TC-1 (Town Center Core) and change the Future Land Use to MRC (Mixed Residential/Commercial). This item is currently under review, with the Zoning Board recommending approval. The project involves acquiring land for future road improvements to Berryhill Road, including stormwater management. This will require approximately 10 acres for a future stormwater pond and at least one smaller pond. The rezoning aims to allow for commercial development to help recoup taxpayer investment in the property and road expansion. Potential work includes site clearing, grading, stormwater system installation, utility work, and potentially road construction, followed by commercial building construction. Local contractors, suppliers, and service providers are encouraged to engage early to understand the project scope as plans develop, before bids and permits are finalized.

Board:
Commission Committee Meeting
Date:
2026-05-19
Type:
Agenda_item
Address:
4351 Berryhill Rd, Pace
Applicant:
Santa Rosa County

7. Public Records. Altumint’s responsibilities regarding public records are

Commission Committee Meeting listed this item on its agenda for 2026-05-19 in Santa Rosa County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Commission Committee Meeting
Date:
2026-05-19
Type:
Agenda_item

8) Engineering - Laredo Street Sidewalks

Santa Rosa County is planning to approve a contract for the Laredo Street Sidewalks project. This project involves the construction of new sidewalks along Laredo Street. The proposed work will likely include site preparation, grading, and the installation of concrete sidewalks. This is an early stage in the public process, as the contract is being presented for approval. Contractors specializing in site preparation, grading, concrete work, and general construction may find opportunities. Suppliers of construction materials and related services could also be involved. Reaching out to the county or the selected contractor early could provide insight into the project timeline and potential needs before formal bidding begins.

Board:
Commission Committee Meeting
Date:
2026-05-19
Type:
Agenda_item
Address:
Laredo Street

8) Public Works - Madura Five Stormwater Lift Station Property Purchase

Santa Rosa County is planning to purchase a property for the Madura Five Stormwater Lift Station Project. The property, identified as parcel #27-2S-28-5645-00D00-0060, is proposed for purchase at a cost of $199,000.00. This item is currently under review by the Commission Committee. The project will involve the acquisition of land for a stormwater lift station. Future phases will likely include site preparation, utility installation, and construction of the lift station itself. Local contractors, suppliers, and service providers in site preparation, utility work, and general construction could find opportunities. Engaging early, before final plans and permits are set, offers the best chance to compete for this upcoming public works project.

Board:
Commission Committee Meeting
Date:
2026-05-19
Type:
Agenda_item
Address:
parcel #27 -2S-28-5645-00D00-0060

8. 2026-7-RSS

Santa Rosa County is proposing to rezone approximately 29 acres of land located on Lands End Lane in Gulf Breeze. The property is currently zoned R1 Single Family Residential and has a Future Land Use (FLU) of SFR. The proposal is to change the zoning to P1 Passive Park and the FLU to CON/REC Conservation/Recreation. This change is planned to allow the county-owned land, which includes sensitive wetland sawgrass, a salt marsh, and watershed area, to be used as a passive park for public enjoyment and permanent conservation. The Zoning Board has recommended approval of this rezoning. This project would involve site preparation for conservation and passive recreational use, potentially including minimal clearing, grading, and the establishment of trails or viewing areas. Contractors specializing in site preparation, landscaping, and potentially light construction for park amenities could find opportunities as this project moves forward. Early engagement is advised as site plans and permits are developed.

Board:
Commission Committee Meeting
Date:
2026-05-19
Type:
Agenda_item
Address:
Lands End Ln, Gulf Breeze
Applicant:
Santa Rosa County

8. Notices - If written notice to a party is required under this agreement, such

Commission Committee Meeting listed this item on its agenda for 2026-05-19 in Santa Rosa County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Commission Committee Meeting
Date:
2026-05-19
Type:
Agenda_item

9) Engineering - Request to Advertise Public Hearing to Vacate a Recorded Plat

Santa Rosa County is planning to hold a public hearing to consider vacating a recorded plat called Hammond Place. This plat is located in Plat Book 15, Pages 78-80, of the Public Records of Santa Rosa County, Florida. The process is currently in the planning stage, with a request to advertise the public hearing. Vacating a recorded plat typically involves legal and administrative steps, and may lead to future development or land use changes. This early stage presents an opportunity for legal professionals and administrative support services to engage with the county. Reaching out now, before final decisions are made, allows businesses to understand the potential implications and prepare for any subsequent actions.

Board:
Commission Committee Meeting
Date:
2026-05-19
Type:
Agenda_item
Address:
Plat Book 15, Pages 78-80, of the Public Records of Santa Rosa County, Florida

9) Engineering – Time Only Change Order for Ashley Plantation

This item concerns a time-only change order for the Ashley Plantation Drainage Improvements project. The proposed change order, number 4, would add 112 days to the existing contract with Chavers Construction. This extension is needed due to the relocation of a gas line and weather delays. The project is currently under review for this contract modification. This change order will likely involve continued site work, including potential grading and drainage system adjustments, as well as utility coordination. Contractors specializing in civil engineering, site preparation, grading, and utility work may find opportunities as the project progresses. Engaging early before final bid adjustments or permit amendments could be advantageous for local businesses.

Board:
Commission Committee Meeting
Date:
2026-05-19
Type:
Agenda_item
Address:
Ashley Plantation

9. 2026-8-RSS

A proposal is under review to change the zoning and future land use for a property located on Dickerson City Road in Milton. The applicant, Alexander Hanson, is seeking to rezone approximately 6.33 acres from RR1 (Rural Residential Single Family) to AGRR (Rural Residential Agriculture). The future land use would also change from GPRR (Garcon Point Rural Residential) to AGRR (Agriculture Rural Residential). This item has been recommended for approval by the Zoning Board and is moving forward for consideration. If approved, this change could lead to site preparation, grading, and potentially utility work, followed by construction depending on the specific development plans. Contractors specializing in site work, general construction, and potentially agricultural-related services could find opportunities as this project progresses through the planning stages. Engaging early before final plans and permits are established may offer an advantage.

Board:
Commission Committee Meeting
Date:
2026-05-19
Type:
Agenda_item
Address:
Dickerson City Rd., Milton
Applicant:
Alexander Hanson

9. The County Administrator or its designee shall have the authority to act on

Commission Committee Meeting listed this item on its agenda for 2026-05-19 in Santa Rosa County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.

Board:
Commission Committee Meeting
Date:
2026-05-19
Type:
Agenda_item

A. Each speed detection and red light violation system shall be equipped to detect a violating vehicle,

The City of Lake Wales is reviewing a proposal for school speed zone and red light enforcement cameras. This project involves installing video technology systems that use radar or laser for speed detection and capture color images of violating vehicles. The proposed systems can be installed on fixed poles, in steel cabinets, or on portable trailers. The technology is designed to be non-invasive, meaning it does not require cutting into the road surface. This item is currently under review as part of RFP No. 25-09. The project would involve the installation of specialized camera and detection equipment, potentially including site preparation for fixed installations and the setup of portable units. Local contractors, suppliers, and service providers in areas such as electrical, low-voltage systems, and potentially concrete or general construction for pole foundations could find opportunities. Reaching out to the city or the vendor early could provide insight into specific needs before final bids and permits are established.

Board:
Commission Committee Meeting
Date:
2026-05-19
Type:
Agenda_item

A. The contractor shall provide a submittal which addresses their capability and proposal of

The City of Lake Wales is reviewing a proposal for the installation and operation of school speed zone and red light enforcement cameras. This project involves conducting traffic studies, producing public education materials, and installing, testing, and maintaining warning signs, signals, speed measurement devices, and violation recording devices. The scope also includes reviewing violations for validity, processing data, and providing a secure web-based system for citation review and financial auditing. The project is currently under review, indicating an early stage in the public process. This initiative will likely involve site preparation, installation of detection and camera systems, and ongoing maintenance and technical support. Local contractors, suppliers, and service providers in areas such as traffic engineering, system installation, IT support, and public information services could find opportunities by engaging early before final plans and bids are set.

Board:
Commission Committee Meeting
Date:
2026-05-19
Type:
Agenda_item
Applicant:
Altumint

A. The proposal must include a statement indicating that if selected, the contractor will indemnify and

This notice concerns a planned School Speed Zone and Red Light Enforcement Camera project, identified as RFP No. 25-09, for the City of Lake Wales. The project requires contractors to indemnify and hold harmless City of Lake Wales personnel and employees from all liability and expenses, including attorney's fees, related to property damage or injury arising from equipment performance or services. This project is currently under review, indicating an early stage in the procurement process. The scope of work will likely involve the installation of cameras, associated electrical and low-voltage systems, and potentially site preparation and concrete work for camera poles. Contractors, suppliers, and service providers in electrical, lighting, and general construction fields are encouraged to engage early to understand project requirements and potential opportunities before final bid and permit processes are settled.

Board:
Commission Committee Meeting
Date:
2026-05-19
Type:
Agenda_item

A. Traffic Study Site Survey: The successful contractor will work with the City of Lake Wales to determine

The City of Lake Wales is planning a traffic study to identify and assess school zones and intersections for potential safety improvements. This project involves a contractor working with the city to gather data on traffic violations. The contractor will monitor selected locations for at least one day to record the frequency and severity of violations. This information will help determine the final sites and provide baseline data for future project evaluation. The project is currently in the planning stages, with site selection and testing methods under review. The scope of work will include site surveys, data collection through monitoring, and reporting. This early stage offers an opportunity for contractors specializing in traffic studies, data analysis, and related services to engage with the city before final plans and permits are established. Early involvement can provide a competitive advantage in securing future work related to this initiative.

Board:
Commission Committee Meeting
Date:
2026-05-19
Type:
Agenda_item

Agenda

[1370 Tiger Point Ln, Gulf Breeze, FL 32563] The document is an agenda for a Commissioner Committee Meeting on May 19, 2026. It lists several items for approval or denial, including contracts for earthwork, drainage improvements, and WWTP equipment, as well as funding requests and grant agreements. Specific projects include the Gateway Logistics Center- County Earthwork Package, Oriole Beach Elementary Drainage Improvements, and MIP WWTP expansions. Public comment is not detailed for these specific items.

Board:
Commission Committee Meeting
Date:
2026-05-19
Type:
Agenda
Address:
1370 Tiger Point Ln, Gulf Breeze, FL 32563

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.

Create your account