Planning Board - May 6, 2026
Planning Board · 2026-05-06 · agenda
[2702-2726 Hanson St.; case RZ26-0041] Planning Board meeting on May 6, 2026, will consider a rezoning request for 0.94 acres at 2702-2726 Hanson St. from Light Industrial (IL) to Heavy Industrial (IH). The applicant, Connor Lot LLC, represented by Ensite Inc., seeks this change to align with surrounding industrial uses and facilitate future development. Staff review indicates consistency with the Comprehensive Plan, noting proximity to interstate access and arterial roadways. No objections were raised by the Fire Marshall or Engineering Division. The property is currently used for indoor and outdoor storage. A separate item on the agenda is the vacation of a 0.46-acre portion of Lee Street right-of-way north of Edwards Drive, requested by the City of Fort Myers, represented by Wilbur Smith LLC, to allow for the full redevelopment of the Fort Myers Yacht Basin. This vacation is supported by letters of no objection from utility providers, though Florida Power & Light noted the City would be responsible for facility removal/relocation. Staff finds this vacation consistent with the Comprehensive Plan's goals for downtown redevelopment. [North of Edwards Drive; case VAC24-0024] Planning Board meeting on May 6, 2026, will consider the vacation of a 0.46 +/- acre portion of Lee Street right-of-way, located north of Edwards Drive. The owner is the City of Fort Myers, and the agent is Terry Cramer III of Wilbur Smith LLC. The purpose of the vacation is to allow for the full redevelopment of the Fort Myers Yacht Basin. All abutting properties are city-owned. Letters of no objection were received from TECO Peoples Gas, Comcast, Lee County Department of Transportation, Lee County Utilities, and Florida Department of Transportation. Florida Power & Light stated the City would be responsible for removal/relocation of their facilities. Staff recommends approval of the vacation to the City Council. The property is located in Section 13, Township 44 South, Range 24 East. This document outlines policies and objectives related to historic preservation, capital improvements, inter-governmental coordination, and public education facilities for the City of Fort Myers. It details strategies for protecting historic resources, planning and funding public infrastructure, coordinating with neighboring jurisdictions and school districts, and ensuring adequate school capacity. Specific policies address adaptive reuse of historic structures, capital project evaluation criteria (projects $20,000 or greater), interlocal agreements for school siting, and school concurrency review processes. The document also mentions the City's commitment to maintaining Level of Service (LOS) standards for public facilities and coordinating with the Lee County School District regarding school capacity and siting. It references the need for financial feasibility in capital projects and the use of impact fees for public facility improvements. The document also notes that the City will review its Capital Improvements Element annually and submit updates to the state. This document details proposed amendments to several elements of a Comprehensive Plan, including Capital Improvements, Inter-Governmental Coordination, Public Education Facilities, and Property Rights. Key changes involve removing outdated policy language, references to dissolved areas (Urban Reserve Area), and language no longer required by state statute. Staff recommends approval of these proposed changes as they are consistent with the Comprehensive Plan and Land Development Code.
Agenda items
- 1) PROPERTY ADDRESS:
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Engineering & Architecture
- 1. A residential development application is submitted to the City of Fort Myers.
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 1. Application Information
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 1. Application Information
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 1. Lee County School District Elementary Schools: 100% of Permanent FISH Capacity
- 1. Lee County School District Elementary Schools: 100% of Permanent FISH Capacity as
- 1. New developments adjacent to school properties shall be required to provide right of
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Engineering & Architecture
- 1. PUBLIC HEARING: Consider a request to rezone
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Engineering & Architecture
- 1. Participation in the Lee County All-Hazards MSTU;
- 1. Single family lots having received final plat approval prior to April 1, 2008, the
- 1. The adoption of the Capital Improvement Element may occur outside of the two regular
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Government Authority
- 1. The determination of evacuation zones, evacuation routes and shelter locations.
- 10) Property Address or Location and Strap #:
- Engineering & Architecture
- Real Estate Development
- 10) Specially Regulated Areas within the City: Is your property on or within any of
- Legal Services
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- 11) Date Property Acquired:
- 11) From the Future Land Use Map:
- 12) From the Official Zoning Map:
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- 12) Specially Regulated Areas within the City: Is your property on or within any of
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- Government Authority
- 13) From the Future Land Use Map:
- 13) Surrounding Businesses By Name and Description of Use (e.g. Smith’s Auto
- 14) Dimensions, Size of Property:
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 14) From the Official Zoning Map:
- Engineering & Architecture
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Appraisal & Inspection
- Title & Settlement Services
- 15) Has a public hearing been held regarding this property in the past five (5) years?
- 15) Surrounding Businesses By Name and Description of Use (e.g. Smith’s Auto
- 16) Dimensions, Size of Property:
- Legal Services
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- 16) General Information for Existing Non-residential Structures on the Property:
- 17) General Information for Existing Residential Structures on the Property:
- 17) Has a public hearing been held regarding this property in the past five (5) years?
- 18) Please fill in the Request for Petition to Vacate, BELOW, and sign in BLUE ink.
- Engineering & Architecture
- Legal Services
- Site Prep, Grading & Hardscape
- General Contractor
- Utilities (Sub)
- Building & Industrial Supply
- Real Estate Development
- Title & Settlement Services
- 18) Potable Water, Sanitary Sewer, Surface Water Drainage System, Solid Waste,
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Plumbing
- HVAC & Climate Control
- Concrete & Masonry
- General Contractor
- Engineering & Architecture
- 19) Describe the use of the property on January 1 of this year.
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- Landscaping & Lawn Service
- 2. In order to ensure continuous pedestrian access to public schools, provisions for the
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Painting & Flooring
- Building & Industrial Supply
- Engineering & Architecture
- 2. Lee County School District Middle Schools: 100% of Permanent FISH Capacity as
- 2. Lee County School District Middle Schools: 100% of Permanent FISH Capacity as adjusted
- 2. Multi-family residential development having received final site plan approval prior to
- Real Estate Development
- Engineering & Architecture
- General Contractor
- 2. PUBLIC HEARING: Consider the vacation of a 0.46
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Government Authority
- 2. Request
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Engineering & Architecture
- Real Estate Development
- 2. Request
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- 2. Retrofitting of City buildings for use as hurricane shelters and certification of these
- General Contractor
- Electrical
- HVAC & Climate Control
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- Cleaning & Janitorial
- Pest Control
- Pressure Washing & Exterior Cleaning
- Security & Fire Systems Installation
- 2. The City of Fort Myers determines that the application is sufficient for processing and
- 2. The design and use of public schools as emergency shelters.
- 3) Agent: Contact person (agent) authorized to receive all communications
- 3) REZONING REQUEST (Rezoning from and to):
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 3. Amendments to residential development approvals issued prior to April 1, 2008, the
- General Contractor
- Site Prep, Grading & Hardscape
- Carpentry & Cabinetry
- Concrete & Masonry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Legal Services
- Landscaping & Lawn Service
- 3. COMPREHENSIVE PLAN: Amendments to the
- Legal Services
- Engineering & Architecture
- Government Authority
- 3. Evaluate school zones to consider safe crossing of children along major roadways
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Painting & Flooring
- Engineering & Architecture
- 3. Lee County School District High Schools: 100% of Permanent FISH Capacity as
- 3. Lee County School District High Schools: 100% of Permanent FISH Capacity as adjusted by
- 3. Recommitting City staff to annual drills/reviews of hurricane evacuation procedures.
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- General Contractor
- Restoration & Waterproofing
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- 3. Staff Review
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- 3. Staff Review
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- 3. The Lee County School District reviews the application for available capacity:
- 3. The designation of sites other than public schools as long-term shelters, as a means
- 4) Developer, if applicable:
- Site Prep, Grading & Hardscape
- General Contractor
- Real Estate Development
- 4) Owner(s): Name, address, and email of all owners of the property. Name and
- 4. Comprehensive Plan Compliance
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 4. Comprehensive Plan Compliance
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 4. Lee County School District Special Purpose Schools: 100% of Permanent FISH
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Legal Services
- Real Estate Development
- 4. Lee County School District Special Purpose Schools: 100% of Permanent FISH Capacity as
- Engineering & Architecture
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- Government Authority
- 4. The City of Fort Myers and the Lee County School District shall review mitigation
- 5) Agent: Contact person (agent) author ized to receive all communications
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- Legal Services
- 5) Is this an application to vacate what : Public right-of-way (ROW), Easement (if so,
- 5. Public Notice
- 5. The following standards apply to any mitigation accepted by the Lee County School
- 6) Developer, if applicable:
- Legal Services
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- 6) Is this a Vacation Application for a public right -of-way (ROW), alley, platted
- 6. Recommended Action
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- General Contractor
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 6. Relocatable classrooms shall not be accepted as mitigation.
- 7) If you answered “Yes” to Question 6, identify the appropriate monetary
- 7) Property Addre ss and Strap #:
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- General Contractor
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 7. If mitigation can be agreed upon, the City of Fort Myers and the Lee County School
- 8) Square footage of the right-of-way, alley, platted subdivision or portions thereof:
- Engineering & Architecture
- Legal Services
- Real Estate Development
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 8. If mitigation cannot be agreed upon, the City of Fort Myers must deny the
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Building & Industrial Supply
- Real Estate Development
- Government Authority
- 9) Description of Location of Property; if there are adjacent streets, please list them:
- 9) Description of Location of Property; if there are adjacent streets, please list them:
- a) Condition of structures;
- a) Located in close proximity (ideally 2½ miles or less) to Interstate
- a) Located in close proximity (ideally 2½ miles or less) to Interstate
- a. If capacity is available within the affected Concurrency Service Area or
- a. Proposed mitigation shall be directed towards a permanent school capacity
- a. REQUEST
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- a. The donation of land or payment of funds for land acquisition or construction
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- Government Authority
- b) Economic feasibility of relocating the industries.
- Legal Services
- Engineering & Architecture
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- b) Rail frontage;
- b) Rail frontage;
- b. Establishment of a Charter School with facilities constructed in accordance
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Real Estate Development
- b. If capacity is not available within the affected Concurrency Service Area,
- c) Immediate access to or frontage on an arterial roadway ✓
- c) Immediate access to or frontage on an arterial roadway;
- c. If capacity is available in the contiguous Concurrency Service Areas or
- cc: Connor Lot, LLC
- Engineering & Architecture
- Legal Services
- Site Prep, Grading & Hardscape
- d) Usable lot sizes-typically 200 feet or deeper
- d) Useable lot sizes-typically 200 feet or deeper;
- d. APPLICANT INFORMATION
- Engineering & Architecture
- Real Estate Development
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- d. If capacity is not available in the contiguous Concurrency Service Areas, the
- e) Distance from residences, schools, and historic districts or sites;
- e) Distance from residences, schools, and historic districts or sites; ✓
- f) Easy access for employees;
- f) Easy access for employees; ✓
- g) Optimum minimum size of 10 acres; and
- g) Optimum minimum size of 10 acres; and,
- h) Located so as to avoid routing industrial traffic through residential
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- h) Located so as to avoid routing industrial traffic through residential areas. ✓
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
Follow this across meetings
Board
Planning BoardApplicants and firms
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account