Browse Miami-Dade County civic records
Every published record for Miami-Dade County, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
29,678 records
JPA WITH CITY OF SWEETWATER
Resolution approving a Joint Participation Agreement between Miami-Dade County and the City of Sweetwater for funding up to $1,500,000 for the design of SW 112th Avenue widening and a new bridge crossing Tamiami/C-4 Canal to SW 8th Street. The project is located in Commission Districts 11 and 12. The anticipated design start date is December 1, 2026, with the agreement continuing through September 30, 2028. The status is Withdrawn. The agenda date was 10/6/2026. The funding source is Mobility Impact Fee Zone D funds. An SBE Services two percent subcontractor goal applies. The City of Sweetwater adopted Resolution No. 5236 on February 9, 2026, approving the JPA. The City will implement a Public Involvement Plan during design and construction. The project aims to decrease traffic congestion on SW 107th Avenue and maximize vehicular and pedestrian safety. The design cost estimate includes a 10% contingency. Any additional expenses will be the responsibility of the City of Sweetwater. Quarterly disbursement of County funds to the City shall be based upon the City's submission of invoices. The project will be assigned to Leandro Ona, P.E., Chief, Highway Division, Department of Transportation and Public Works.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Withdrawn
- Address:
- SW 112th Avenue, from Flagler Street to SW 8th Street, including a new bridge crossing Tamiami/C-4 Canal
- Applicant:
- City of Sweetwater
JPA WITH CITY OF SWEETWATER
Resolution approving a Joint Participation Agreement between Miami-Dade County and the City of Sweetwater for up to $1,500,000 in Mobility Impact Fee funds for the design of SW 112th Avenue widening and a new bridge crossing Tamiami/C-4 Canal to SW 8th Street. The item was withdrawn at the Transportation Committee on 9/9/2026. The design start date is anticipated as December 1, 2026, with the agreement continuing through September 30, 2028. The project is located in Commission Districts 11 and 12. The City of Sweetwater adopted Resolution No. 5236 on February 9, 2026, approving the JPA. A 2% SBE subcontractor goal applies. No public comment sentiment is stated.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Withdrawn
- Address:
- SW 112th Avenue widening and a new bridge crossing Tamiami/C-4 Canal to SW 8th Street, City of Sweetwater
- Applicant:
- City of Sweetwater
JPA WITH CITY OF SWEETWATER
A resolution approving a Joint Participation Agreement between Miami-Dade County and the City of Sweetwater for funding up to $1,500,000 for the design of SW 112th Avenue widening and a new bridge crossing Tamiami/C-4 Canal to SW 8th Street. The item was withdrawn at the Transportation Cmte meeting on 9/9/2026. The project is located in Commission Districts 11 and 12. The anticipated design start date is December 1, 2026, with the agreement continuing through September 30, 2028. The funding source is Mobility Impact Fee Zone D funds. The City of Sweetwater adopted Resolution No. 5236 on February 9, 2026, approving the JPA. An SBE Services two percent subcontractor goal applies. The project aims to decrease traffic congestion on SW 107th Avenue and maximize vehicular and pedestrian safety.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Withdrawn
- Address:
- SW 112th Avenue, from Flagler Street to SW 8th Street, including a new bridge crossing Tamiami/C-4 Canal
- Applicant:
- City of Sweetwater
JPA WITH CITY OF SWEETWATER
Resolution approving a Joint Participation Agreement between Miami-Dade County and the City of Sweetwater for funding up to $1,500,000 for the design of SW 112th Avenue widening and a new bridge crossing Tamiami/C-4 Canal to SW 8th Street. The item was withdrawn at the Transportation Cmte meeting on 9/9/2026. The project is located in Commission Districts 11 and 12. The design start date is anticipated as December 1, 2026, with the agreement continuing through September 30, 2028. Funding is from Mobility Impact Fee Zone D funds. The City of Sweetwater adopted Resolution No. 5236 on February 9, 2026, approving the JPA. An SBE Services two percent subcontractor goal applies. No public comment sentiment is stated in the document.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Withdrawn
- Address:
- SW 112th Avenue widening and new bridge crossing Tamiami/C-4 Canal to SW 8th Street, City of Sweetwater
- Applicant:
- City of Sweetwater
JPA WITH CITY OF SWEETWATER
The document is a legislative item for a Joint Participation Agreement between Miami-Dade County and the City of Sweetwater to fund design of SW 112th Avenue widening and a new bridge crossing Tamiami/C-4 Canal to SW 8th Street. The item was withdrawn at the Transportation Committee meeting on 9/9/2026. The funding amount is up to $1,500,000 from Mobility Impact Fee Zone D funds. The project is located in Commission Districts 11 and 12. The anticipated design start date is December 1, 2026, with the agreement continuing through September 30, 2028. The City Council adopted Resolution No. 5236 on February 9, 2026, approving the JPA. A 2% SBE subcontractor goal applies. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Withdrawn
- Address:
- SW 112th Avenue, from Flagler Street to SW 8th Street, including a new bridge crossing Tamiami/C-4 Canal
- Applicant:
- City of Sweetwater
JVA ENGINEERING CONTRACTORS, INC. FOR ROADWAY IMPROVEMENTS
Resolution authorizing Supplemental Agreement No. 1 with JVA Engineering Contractors, Inc. for design-build services for roadway improvements to NE 2nd Avenue from NE 20th Street to NE 36th Street, extending contract duration by 380 non-compensable calendar days from 420 to 800 days. No additional compensation. The extension addresses schedule impacts from conflicts between existing electrical utility facilities and proposed storm drainage improvements. Project No. DB21-DTPW-02; Contract No. 20210014. Original contract award amount was $13,974,652. Status: In Committee. Agenda date 10/6/2026. No public comment sentiment stated.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- In Committee; recommended for approval by staff
- Address:
- NE 2nd Avenue from NE 20th Street to NE 36th Street
- Applicant:
- JVA Engineering Contractors, Inc.
JVA ENGINEERING CONTRACTORS, INC. FOR ROADWAY IMPROVEMENTS
Resolution authorizing Supplemental Agreement No. 1 with JVA Engineering Contractors, Inc. for design-build services for roadway improvements to NE 2nd Avenue from NE 20th Street to NE 36th Street, retroactively increasing contract duration by 380 non-compensable calendar days from 420 to 800 calendar days. No additional compensation. The extension addresses schedule impacts from conflicts between existing electrical utility facilities and proposed storm drainage improvements. The Transportation Committee forwarded to the BCC with a favorable recommendation on 9/9/2026. Agenda date 10/6/2026. No public comment sentiment is stated in the document.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by Transportation Cmte on 9/9/2026; pending BCC action on 10/6/2026
- Address:
- NE 2nd Avenue from NE 20th Street to NE 36th Street
- Applicant:
- JVA Engineering Contractors, Inc.
JVA ENGINEERING CONTRACTORS, INC. FOR ROADWAY IMPROVEMENTS
Resolution authorizing Supplemental Agreement No. 1 with JVA Engineering Contractors, Inc. for design-build services for roadway improvements to NE 2nd Avenue from NE 20th Street to NE 36th Street, Project No. DB21-DTPW-02, Contract No. 20210014. The agreement retroactively increases contract duration by 380 non-compensable calendar days, from 420 to 800 calendar days, due to schedule impacts from conflicts between existing electrical utility facilities and proposed storm drainage improvements. No additional compensation is associated with the time extension. The Transportation Committee forwarded it to the BCC with a favorable recommendation on 9/9/2026; the BCC agenda date is 10/6/2026. The original contract was awarded on September 1, 2022, in the amount of $13,974,652, with a duration of 420 calendar days. Notice to Proceed was issued on May 1, 2023. The project is in Commission District 3. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Transportation Committee forwarded to BCC with a favorable recommendation on 9/9/2026; pending BCC decision on 10/6/2026.
- Address:
- NE 2nd Avenue from NE 20th Street to NE 36th Street
- Applicant:
- JVA Engineering Contractors, Inc.
JVA ENGINEERING CONTRACTORS, INC. FOR ROADWAY IMPROVEMENTS
Resolution authorizing Supplemental Agreement No. 1 with JVA Engineering Contractors, Inc. for design-build services for roadway improvements to NE 2nd Avenue from NE 20th Street to NE 36th Street, extending contract duration by 380 non-compensable calendar days from 420 to 800 calendar days. No additional compensation. The extension addresses schedule impacts from conflicts between existing electrical utility facilities and proposed storm drainage improvements. Original contract awarded September 1, 2022, in the amount of $13,974,652. Notice to Proceed issued May 1, 2023. Transportation Cmte forwarded to BCC with favorable recommendation on 9/9/2026. Agenda date 10/6/2026. No public comment sentiment stated.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026; pending BCC assignment, agenda date 10/6/2026
- Address:
- NE 2nd Avenue from NE 20th Street to NE 36th Street
- Applicant:
- JVA Engineering Contractors, Inc.
JVA ENGINEERING CONTRACTORS, INC. FOR ROADWAY IMPROVEMENTS
Resolution authorizing Supplemental Agreement No. 1 with JVA Engineering Contractors, Inc. for design-build services for roadway improvements to NE 2nd Avenue from NE 20th Street to NE 36th Street (Project No. DB21-DTPW-02; Contract No. 20210014). The agreement retroactively increases contract duration by 380 non-compensable calendar days (from 420 to 800 calendar days) due to conflicts between existing electrical utility facilities and the proposed storm drainage improvements. The Transportation Committee forwarded it to the Board of County Commissioners with a favorable recommendation on 9/9/2026; agenda date is 10/6/2026. No fiscal impact. No public comment sentiment is stated in the document.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Transportation Committee forwarded to BCC with a favorable recommendation on 9/9/2026; final action pending (agenda date 10/6/2026)
- Address:
- NE 2nd Avenue from NE 20th Street to NE 36th Street
- Applicant:
- JVA Engineering Contractors, Inc.
JVA ENGINEERING CONTRACTORS, INC. FOR ROADWAY IMPROVEMENTS
Resolution authorizing Supplemental Agreement No. 1 with JVA Engineering Contractors, Inc. for design-build services for roadway improvements to NE 2nd Avenue from NE 20th Street to NE 36th Street, Project No. DB21-DTPW-02, Contract No. 20210014. The agreement retroactively increases contract duration by 380 non-compensable calendar days, from 420 to 800 calendar days, due to schedule impacts from conflicts between existing electrical utility facilities and proposed storm drainage improvements. No additional compensation is associated with the time extension. The Transportation Cmte forwarded it to the BCC with a favorable recommendation on 9/9/2026. Agenda date is 10/6/2026. No public comment sentiment is stated.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by Transportation Cmte on 9/9/2026; pending BCC assignment, agenda date 10/6/2026
- Address:
- NE 2nd Avenue from NE 20th Street to NE 36th Street
- Applicant:
- JVA Engineering Contractors, Inc.
JVA ENGINEERING CONTRACTORS, INC. FOR ROADWAY IMPROVEMENTS
Resolution authorizing Supplemental Agreement No. 1 with JVA Engineering Contractors, Inc. for design-build services for roadway improvements to NE 2nd Avenue from NE 20th Street to NE 36th Street, Miami-Dade County, Florida. The agreement retroactively increases contract duration by 380 non-compensable calendar days, from 420 to 800 calendar days, due to schedule impacts from conflicts between existing electrical utility facilities and proposed storm drainage improvements. No additional compensation is associated with the time extension. The original contract award was $13,974,652. The Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026. Agenda date is 10/6/2026. The project is in Commission District 3. No public comment sentiment is stated in the document.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026; pending BCC assignment for agenda date 10/6/2026.
- Address:
- NE 2nd Avenue from NE 20th Street to NE 36th Street
- Applicant:
- JVA Engineering Contractors, Inc.
JVA ENGINEERING CONTRACTORS, INC. FOR ROADWAY IMPROVEMENTS
Resolution authorizing Supplemental Agreement No. 1 with JVA Engineering Contractors, Inc. for design-build services for roadway improvements to NE 2nd Avenue from NE 20th Street to NE 36th Street, extending contract duration by 380 non-compensable calendar days from 420 to 800 calendar days. No additional compensation. Approved by Transportation Committee on 9/9/2026 with favorable recommendation; pending before Board of County Commissioners on 10/6/2026. No public comment or stakeholder sentiment stated.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Forwarded to BCC with a favorable recommendation by Transportation Cmte on 9/9/2026; pending before Board on 10/6/2026
- Address:
- NE 2nd Avenue from NE 20th Street to NE 36th Street
- Applicant:
- JVA Engineering Contractors, Inc.
JVA ENGINEERING CONTRACTORS, INC. FOR ROADWAY IMPROVEMENTS
Resolution authorizing Supplemental Agreement No. 1 with JVA Engineering Contractors, Inc. for design-build services for roadway improvements to NE 2nd Avenue from NE 20th Street to NE 36th Street, retroactively increasing contract duration by 380 non-compensable calendar days from 420 to 800 calendar days. No additional compensation. The extension addresses schedule impacts from conflicts between existing electrical utility facilities and proposed storm drainage improvements. Original contract awarded September 1, 2022, in the amount of $13,974,652. Notice to Proceed issued May 1, 2023. Agenda date October 6, 2026. Status: In Committee. File Number: 261480. Project No. DB21-DTPW-02; Contract No. 20210014. No public comment sentiment stated.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Recommended for approval by staff; status In Committee; agenda date October 6, 2026
- Address:
- NE 2nd Avenue from NE 20th Street to NE 36th Street
- Applicant:
- JVA Engineering Contractors, Inc.
JVA ENGINEERING CONTRACTORS, INC. FOR ROADWAY IMPROVEMENTS
Resolution authorizing Supplemental Agreement No. 1 with JVA Engineering Contractors, Inc. for design-build services for roadway improvements to NE 2nd Avenue from NE 20th Street to NE 36th Street, extending contract duration by 380 non-compensable calendar days from 420 to 800 calendar days. No additional compensation. The extension addresses schedule impacts from conflicts between existing electrical utility facilities and proposed storm drainage improvements. Original contract amount was $13,974,652. The project is in Commission District 3. The item was introduced on 8/19/2026 and is scheduled for the 10/6/2026 agenda. Status is In Committee. No public comment sentiment is stated.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- In Committee; recommended for approval by staff; agenda date 10/6/2026
- Address:
- NE 2nd Avenue from NE 20th Street to NE 36th Street
- Applicant:
- JVA Engineering Contractors, Inc.
JVA ENGINEERING CONTRACTORS, INC. FOR ROADWAY IMPROVEMENTS
Resolution authorizing Supplemental Agreement No. 1 with JVA Engineering Contractors, Inc. for design-build services for roadway improvements to NE 2nd Avenue from NE 20th Street to NE 36th Street, Project No. DB21-DTPW-02, Contract No. 20210014. The agreement retroactively increases contract duration by 380 non-compensable calendar days, from 420 to 800 calendar days, due to schedule impacts from conflicts between existing electrical utility facilities and proposed storm drainage improvements. No additional compensation is associated with the time extension. The Transportation Cmte forwarded it to the BCC with a favorable recommendation on 9/9/2026; the BCC agenda date is 10/6/2026. The original contract was awarded on September 1, 2022, in the amount of $13,974,652, with a Notice to Proceed issued on May 1, 2023. The project is in Commission District 3. No public comment or stakeholder sentiment is stated in the document.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026; final decision not stated (status: Before the Board)
- Address:
- NE 2nd Avenue from NE 20th Street to NE 36th Street
- Applicant:
- JVA Engineering Contractors, Inc. (Design-Builder); Miami-Dade County Department of Transportation and Public Works (DTPW)
JVA ENGINEERING CONTRACTORS, INC. FOR ROADWAY IMPROVEMENTS
Resolution authorizing Supplemental Agreement No. 1 with JVA Engineering Contractors, Inc. for design-build services for roadway improvements to NE 2nd Avenue from NE 20th Street to NE 36th Street, retroactively increasing contract duration by 380 non-compensable calendar days from 420 to 800 calendar days. The extension addresses schedule impacts from conflicts between existing electrical utility facilities and proposed storm drainage improvements. No additional compensation is associated with the time extension. The Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026. Agenda date is 10/6/2026. Original contract award was $13,974,652 with 420 calendar days, approved September 1, 2022, per Resolution No. R-829-22. Notice to Proceed issued May 1, 2023. Project is in Commission District 3. No public comment sentiment is stated.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026; pending BCC assignment, agenda date 10/6/2026
- Address:
- NE 2nd Avenue from NE 20th Street to NE 36th Street
- Applicant:
- JVA Engineering Contractors, Inc.
JVA ENGINEERING CONTRACTORS, INC. FOR ROADWAY IMPROVEMENTS
Resolution authorizing Supplemental Agreement No. 1 with JVA Engineering Contractors, Inc. for design-build services for roadway improvements to NE 2nd Avenue from NE 20th Street to NE 36th Street, extending contract duration by 380 non-compensable calendar days from 420 to 800 calendar days. No additional compensation. File Number 261480. Status: In Committee. Agenda Date 10/6/2026. Introduced 8/19/2026. Project No. DB21-DTPW-02; Contract No. 20210014. Original contract amount $13,974,652. Original award Resolution No. R-829-22 on September 1, 2022. Notice to Proceed issued May 1, 2023. Reason for extension: conflicts between existing electrical utility facilities and proposed storm drainage improvements. No fiscal impact. Located in Commission District 3. Staff recommendation: approve. No public comment sentiment stated.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Recommended for approval (staff recommendation); status In Committee; agenda date 10/6/2026
- Address:
- NE 2nd Avenue from NE 20th Street to NE 36th Street
- Applicant:
- JVA Engineering Contractors, Inc.
JVA ENGINEERING CONTRACTORS, INC. FOR ROADWAY IMPROVEMENTS
Resolution authorizing Supplemental Agreement No. 1 with JVA Engineering Contractors, Inc. for design-build services for roadway improvements to NE 2nd Avenue from NE 20th Street to NE 36th Street, extending contract duration by 380 non-compensable calendar days from 420 to 800 calendar days. The extension addresses schedule impacts from conflicts between existing electrical utility facilities and proposed storm drainage improvements. No additional compensation is associated with the time extension. The Transportation Cmte forwarded it to the BCC with a favorable recommendation on 9/9/2026. Agenda date is 10/6/2026. The original contract was awarded on September 1, 2022, in the amount of $13,974,652, with a duration of 420 calendar days. Notice to Proceed was issued on May 1, 2023. The project is in Commission District 3. No public comment sentiment is stated.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026; pending BCC assignment; agenda date 10/6/2026
- Address:
- NE 2nd Avenue from NE 20th Street to NE 36th Street
- Applicant:
- JVA Engineering Contractors, Inc.
JVA ENGINEERING CONTRACTORS, INC. FOR ROADWAY IMPROVEMENTS
Resolution authorizing Supplemental Agreement No. 1 with JVA Engineering Contractors, Inc. for design-build services for roadway improvements to NE 2nd Avenue from NE 20th Street to NE 36th Street, extending contract duration by 380 non-compensable calendar days from 420 to 800 calendar days. The extension addresses schedule impacts from conflicts between existing electrical utility facilities and proposed storm drainage improvements. No additional compensation is associated with the time extension. The Transportation Cmte forwarded the item to the BCC with a favorable recommendation on 9/9/2026. Agenda date is 10/6/2026. The contract was originally awarded on September 1, 2022, pursuant to Resolution No. R-829-22, in the amount of $13,974,652. Notice to Proceed was issued on May 1, 2023. The project is in Commission District 3, represented by Commissioner Keon Hardemon. No public comment sentiment is stated in the document.
- Board:
- Transportation Cmte
- Date:
- 2026-09-09
- Type:
- Resolution
- Decision:
- Transportation Cmte forwarded to BCC with a favorable recommendation on 9/9/2026; pending BCC assignment, agenda date 10/6/2026.
- Address:
- NE 2nd Avenue from NE 20th Street to NE 36th Street
- Applicant:
- JVA Engineering Contractors, Inc.
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account