Skip to main content

Be First, Build Lasting Relationships

Transportation Cmte: July 2026

Miami-Dade County

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County is seeking to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. FDOT will fund and maintain the hardware, while the County's role is limited to approving installation locations and coordinating schedules. The agreement, effective from September 24, 2025, to September 23, 2026, also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT for additional counter systems, provided they have no negative fiscal impact on the County. The item is currently In Committee.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
In Committee
Address:
10800 Collins Avenue (Atlantic Greenway Trail, Haulover Park) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County (Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works) and Florida Department of Transportation (FDOT)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County is seeking to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. FDOT will fund and maintain the hardware, while the County's role is limited to approving installation locations and coordinating schedules. The agreement, effective from September 24, 2025, to September 23, 2026, also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT, provided they have no negative fiscal impact on the County. The counter systems use technology to collect bicycle and pedestrian volume data 24/7 without interfering with trail use. Public comment is not stated. The item is in committee.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
In Committee (seeking ratification)
Address:
10800 Collins Avenue (Atlantic Greenway Trail, Haulover Park) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County and Florida Department of Transportation (FDOT)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County is seeking to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. FDOT will fund and maintain the hardware, while the County's role is limited to approving installation locations and coordinating schedules. The agreement, effective from September 24, 2025, to September 23, 2026, aims to collect bicycle and pedestrian volume data. The County Mayor or designee is also authorized to enter into future similar agreements with FDOT, provided they have no negative fiscal impact on the County. The item was introduced on 6/30/2026 and is currently in committee, with an agenda date of 9/1/2026.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
In Committee (seeking ratification)
Address:
10800 Collins Avenue (Atlantic Greenway Trail, Haulover Park) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County (Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works) and Florida Department of Transportation (FDOT)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners (BCC) is set to consider a resolution ratifying a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. The MOA, effective from September 24, 2025, to September 23, 2026, allows FDOT to install and maintain the hardware, with Miami-Dade County's role limited to approving locations and coordinating schedules. FDOT will fund all costs, and the county will receive traffic data at no cost. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT for additional counter systems, provided they have no negative fiscal impact on the county and are approved by the County Attorney's Office. The Transportation Committee forwarded the item to the BCC with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Pending BCC Assignment (Resolution before the Board)
Address:
10800 Collins Avenue (Atlantic Greenway Trail, Haulover Park) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County Parks, Recreation and Open Spaces Department and Florida Department of Transportation

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners (BCC) is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. FDOT will fund and maintain the hardware, while the County's role is limited to approving locations and coordinating schedules. The MOA has a term of less than one year, from September 24, 2025, to September 23, 2026. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT, provided they have no negative fiscal impact on the County. The Transportation Committee forwarded this item to the BCC with a favorable recommendation. No public comment is stated in the document.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; pending BCC Assignment.
Address:
10800 Collins Avenue (Atlantic Greenway Trail, Haulover Park) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County (Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works) and Florida Department of Transportation

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. FDOT will fund and maintain the hardware, while the County's role is limited to approving locations and coordinating schedules. The agreement, effective from September 24, 2025, to September 23, 2026, aims to collect bicycle and pedestrian volume data. The Board is also asked to delegate authority to the County Mayor or designee to enter into future similar agreements with FDOT, provided they have no negative fiscal impact on the County. The Transportation Committee forwarded the item to the Board with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; Pending BCC Assignment
Address:
10800 Collins Avenue (Haulover Park, Atlantic Greenway Trail) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works (DTPW) in conjunction with Florida Department of Transportation (FDOT)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners (BCC) is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. The MOA, effective from September 24, 2025, to September 23, 2026, allows FDOT to install and maintain the hardware, with Miami-Dade County's role limited to approving installation locations and coordinating schedules. FDOT will fund all costs associated with the counter systems, and the County will receive traffic data at no cost. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT for additional counter systems, provided they have no negative fiscal impact on the County. The Transportation Committee forwarded the item to the BCC with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; pending BCC Assignment
Address:
10800 Collins Avenue (Atlantic Greenway Trail, Haulover Park) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County Parks, Recreation and Open Spaces Department and Florida Department of Transportation

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. FDOT will fund and maintain the hardware, while the County's role is limited to approving installation locations and coordinating schedules. The MOA has a term of less than one year, from September 24, 2025, to September 23, 2026. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT for additional counter systems, provided they have no negative fiscal impact on the County. The Transportation Committee forwarded this item with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; pending Board of County Commissioners approval
Address:
10800 Collins Avenue (Atlantic Greenway Trail, Haulover Park) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County (Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works) and Florida Department of Transportation (FDOT)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners (BCC) is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. FDOT will fund and maintain the hardware, while the County's role is limited to approving locations and coordinating schedules. The MOA has a term from September 24, 2025, to September 23, 2026. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT for additional counter systems, provided they have no negative fiscal impact on the County. The Transportation Committee forwarded this item to the BCC with a favorable recommendation. No public comment is stated in the document.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; Pending BCC Assignment
Address:
10800 Collins Avenue (Atlantic Greenway Trail, within Haulover Park) and West Palm Drive (South Dade Trail, within Florida City)
Applicant:
Miami-Dade County (Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works) and Florida Department of Transportation

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County is seeking to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. FDOT will fund and maintain the hardware, while the County's role is limited to approving installation locations and coordinating schedules. The agreement, effective from September 24, 2025, to September 23, 2026, also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT, provided they have no negative fiscal impact on the County. The counter systems use technology to collect bicycle and pedestrian volume data 24/7 without interfering with trail use. This item is in committee and has not yet received final action.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
In Committee
Address:
10800 Collins Avenue (Atlantic Greenway Trail, Haulover Park) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County (Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works) and Florida Department of Transportation (FDOT)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County is seeking to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. FDOT will fund and maintain the hardware, while the County's role is limited to approving installation locations and coordinating schedules. The agreement, effective from September 24, 2025, to September 23, 2026, also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT, provided they have no negative fiscal impact on the County. The first counter system is on the Atlantic Greenway Trail at 10800 Collins Avenue, Haulover Park. The second is on the South Dade Trail at West Palm Drive in Florida City. The item is currently in committee.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
In Committee
Address:
10800 Collins Avenue, Haulover Park; West Palm Drive, Florida City
Applicant:
Miami-Dade County and Florida Department of Transportation (FDOT)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners (BCC) is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. The MOA, effective from September 24, 2025, to September 23, 2026, allows FDOT to install and maintain the hardware, with Miami-Dade County responsible for approving locations and coordinating schedules. The county will receive non-motorized traffic data at no cost. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT for additional counter systems, provided they have no negative fiscal impact on the county and are approved by the County Attorney's Office. The Transportation Committee forwarded this item to the BCC with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; Pending BCC Assignment
Address:
10800 Collins Avenue (Haulover Park, Atlantic Greenway Trail) and West Palm Drive (South Dade Trail)
Applicant:
Miami-Dade County Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works (DTPW) in agreement with Florida Department of Transportation (FDOT)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners (BCC) is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. The MOA, effective from September 24, 2025, to September 23, 2026, allows FDOT to install and maintain the hardware, with the County's role limited to approving locations and coordinating schedules. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT for additional counter systems, provided they have no negative fiscal impact on the County. FDOT will fund all costs associated with the counter systems, and the County will receive non-motorized traffic data at no cost. The Transportation Committee forwarded the item to the BCC with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation (Transportation Committee); Pending BCC Assignment
Address:
10800 Collins Avenue (Atlantic Greenway Trail, Haulover Park) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County Parks, Recreation and Open Spaces Department (Requester), Miami-Dade County and Florida Department of Transportation (Agreement Parties)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners (BCC) is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. FDOT will fund and maintain the hardware, while the County's role is limited to approving locations and coordinating schedules. The MOA has a term of less than one year, from September 24, 2025, to September 23, 2026. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT for additional counter systems, provided they have no negative fiscal impact on the County. The Transportation Committee forwarded the item to the BCC with a favorable recommendation. The item was introduced on 6/30/2026 and is scheduled for an Agenda Date of 9/1/2026.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; Pending BCC Assignment
Address:
10800 Collins Avenue (Atlantic Greenway Trail, Haulover Park) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County Parks, Recreation and Open Spaces Department (PROS) and Department of Transportation and Public Works (DTPW) in conjunction with Florida Department of Transportation (FDOT)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. The MOA, effective from September 24, 2025, to September 23, 2026, involves FDOT funding and maintaining the counter systems, while the County's role is limited to approving installation locations and coordinating schedules. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT for additional counter systems, provided they have no negative fiscal impact on the County. The Transportation Committee forwarded this item with a favorable recommendation. No public comment is stated.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation (Transportation Committee); Resolution ratification is pending Board of County Commissioners approval.
Address:
10800 Collins Avenue (Atlantic Greenway Trail, Haulover Park) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County (Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works) and Florida Department of Transportation

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners (BCC) is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. FDOT will fund and maintain the hardware, while the County's role is limited to approving locations and coordinating schedules. The MOA term is from September 24, 2025, to September 23, 2026. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT for counter systems on county trails, provided they have no negative fiscal impact on the County and are approved by the County Attorney's Office. The Transportation Committee forwarded the item to the BCC with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; Pending BCC Assignment
Address:
10800 Collins Avenue (Haulover Park, Atlantic Greenway Trail) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works (DTPW) in conjunction with Florida Department of Transportation (FDOT)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners (BCC) is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. The MOA, effective from September 24, 2025, to September 23, 2026, allows FDOT to install and maintain the hardware, with Miami-Dade County responsible for approving locations and coordinating schedules. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT for additional counter systems, provided they have no negative fiscal impact on the County. The Transportation Committee forwarded this item to the BCC with a favorable recommendation. No public comment is stated in the document.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; Pending BCC Assignment
Address:
10800 Collins Avenue (Haulover Park, Atlantic Greenway Trail) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works (DTPW) in conjunction with Florida Department of Transportation (FDOT)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners (BCC) is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. FDOT will fund and maintain the hardware, while the County's role is limited to approving locations and coordinating schedules. The MOA has a term from September 24, 2025, to September 23, 2026. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT for additional counter systems, provided they have no negative fiscal impact on the County. The Transportation Committee forwarded this item to the BCC with a favorable recommendation. No public comment is stated in the document.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; pending BCC Assignment.
Address:
10800 Collins Avenue (Atlantic Greenway Trail, within Haulover Park) and West Palm Drive (South Dade Trail, within Florida City)
Applicant:
Miami-Dade County (Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works) and Florida Department of Transportation (FDOT)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. FDOT will fund and maintain the hardware, while the County's role is limited to approving installation locations and coordinating schedules. The agreement is for a term of less than one year, from September 24, 2025, to September 23, 2026. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT for additional counter systems, provided they have no negative fiscal impact on the County. The Transportation Committee forwarded the item to the Board with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; Pending BCC Assignment
Address:
10800 Collins Avenue (Haulover Park, Atlantic Greenway Trail) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works (for the County); Florida Department of Transportation (FDOT)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. FDOT will fund and maintain the hardware, while the County's role is limited to approving locations and coordinating schedules. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT for additional counter systems, provided they have no negative fiscal impact on the County. The MOA term is from September 24, 2025, to September 23, 2026. The Transportation Committee forwarded this item to the Board with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; Pending BCC Assignment
Address:
10800 Collins Avenue (Haulover Park, Atlantic Greenway Trail) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works (DTPW) in conjunction with Florida Department of Transportation (FDOT)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners (BCC) is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. The MOA, effective from September 24, 2025, to September 23, 2026, allows FDOT to install and maintain the hardware, with Miami-Dade County responsible for approving installation locations and coordinating schedules. The agreement aims to collect bicycle and pedestrian volume data. The BCC is also asked to delegate authority to the County Mayor or designee to enter into future similar agreements with FDOT for additional counter systems, provided they have no negative fiscal impact on the County. The Transportation Committee forwarded the item to the BCC with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; Pending BCC Assignment
Address:
10800 Collins Avenue (Haulover Park, Atlantic Greenway Trail) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works (for the County); Florida Department of Transportation (FDOT)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. FDOT will fund and maintain the hardware, while the County's role is to approve installation locations and coordinate scheduling. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT for additional counter systems, provided they have no negative fiscal impact on the County. The MOA term is from September 24, 2025, to September 23, 2026. The Transportation Committee forwarded the item with a favorable recommendation. No public comment is stated.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Before the Board (Transportation Committee forwarded with favorable recommendation)
Address:
10800 Collins Avenue (Atlantic Greenway Trail, Haulover Park) and West Palm Drive (South Dade Trail, Florida City)
Applicant:
Miami-Dade County (Parks, Recreation and Open Spaces Department and Department of Transportation and Public Works) and Florida Department of Transportation (FDOT)

MOU WITH FDOT FOR COUNTER SYSTEMS ON COUNTY OWNED TRAILS

Miami-Dade County Board of County Commissioners (BCC) is considering a resolution to ratify a Memorandum of Agreement (MOA) with the Florida Department of Transportation (FDOT) for the installation and maintenance of two counter systems on county-owned trails within the Florida Shared-Use Nonmotorized (SUN) Trail Network. FDOT will fund and maintain the hardware, while the County's role is limited to approving locations and coordinating schedules. The MOA has a term of less than one year, from September 24, 2025, to September 23, 2026. The resolution also delegates authority to the County Mayor or designee to enter into future similar agreements with FDOT, provided they have no negative fiscal impact on the County. The Transportation Committee forwarded the item to the BCC with a favorable recommendation. The item was introduced on 6/30/2026 and is scheduled for an agenda date of 9/1/2026.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; Pending BCC Assignment
Address:
10800 Collins Avenue (Atlantic Greenway Trail, within Haulover Park) and West Palm Drive (South Dade Trail, within Florida City)
Applicant:
Miami-Dade County Parks, Recreation and Open Spaces Department and Florida Department of Transportation

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is considering an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for roadway improvements on SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project, which includes work on NW 74th Street Connector and NW 72nd Avenue, involves reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, a traffic separator, loops, and signage. The estimated cost is $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; pending Board of County Commissioners approval
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Florida Department of Transportation (FDOT) and Miami-Dade County

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is considering an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements on SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, traffic separators, loops, and signage. The project is estimated to cost $5,900,000 and will be funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon completion. The Transportation Committee forwarded the item to the Board with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; pending BCC Assignment
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Florida Department of Transportation and Miami-Dade County

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County is approving an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for roadway improvements along SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, traffic separators, loops, and signage. The project is estimated to cost $5,900,000 and will be funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Approved (Resolution)
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Miami-Dade County and Florida Department of Transportation

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is approving an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements on SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, traffic separators, loops, and signage. The project is estimated to cost $5,900,000 and will be funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Approved (Resolution)
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Florida Department of Transportation (FDOT) and Miami-Dade County

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is considering an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements along SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, traffic separators, loops, and signage. The project is estimated to cost $5,900,000 and will be funded and built by FDOT. The anticipated construction start date is March 2027. The Transportation Committee forwarded the item to the Board with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation (Transportation Committee)
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Miami-Dade County and Florida Department of Transportation (FDOT)

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is set to approve an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements on SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project, which includes work on NW 74th Street Connector and NW 72nd Avenue, involves reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, traffic separators, loops, and signage. FDOT will fund and build the project, estimated at $5,900,000, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion, funded through the DTPW General Fund. The Transportation Committee forwarded the item to the Board with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Pending BCC Assignment (Resolution approving agreement)
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Florida Department of Transportation (FDOT) and Miami-Dade County

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is considering an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for roadway improvements on SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue. The project, with an estimated cost of $5,900,000, will be funded and built by FDOT, with construction anticipated to start in March 2027. Improvements include sidewalk reconstruction, curb ramps, milling and resurfacing, widening, striping, and traffic separators. The County will be responsible for maintenance upon project completion.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Pending BCC Assignment
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Miami-Dade County and Florida Department of Transportation

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County is approving an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for roadway improvements along SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, milling and resurfacing, widening, striping, and a traffic separator. The project is estimated to cost $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon completion.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Approved (Resolution)
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Miami-Dade County and Florida Department of Transportation

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County is approving an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for roadway improvements on SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, milling and resurfacing, widening, striping, and a traffic separator. The project is estimated to cost $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Approved (Resolution)
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Miami-Dade County and Florida Department of Transportation

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is considering an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements along SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project, with an estimated cost of $5,900,000 funded by FDOT, includes reconstruction of sidewalks, curb ramps, milling and resurfacing, widening, striping, traffic separators, loops, and signage. The anticipated construction start date is March 2027. The Transportation Committee forwarded the item to the Board with a favorable recommendation on July 14, 2026. The Board of County Commissioners is scheduled to review this on September 1, 2026.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road
Applicant:
Florida Department of Transportation (FDOT) and Miami-Dade County

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County is approving an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements along SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, traffic separators, loops, and signage. The project is estimated to cost $5,900,000 and will be funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Approved (Resolution)
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Miami-Dade County and Florida Department of Transportation

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is set to approve an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for roadway improvements along SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project, identified as Project No. FM452566-1-52-01, includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements involve reconstruction of sidewalks, curb ramps, milling and resurfacing, widening, striping, and installation of a traffic separator, curb and gutter, loops, and signage. FDOT will fund and build the project, estimated at $5,900,000, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for ongoing maintenance. The Transportation Committee forwarded the item to the Board with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Approved (Resolution)
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Florida Department of Transportation (FDOT) and Miami-Dade County

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners (BCC) is set to approve an Off-System Construction and Maintenance Agreement between Miami-Dade County and the Florida Department of Transportation (FDOT) for local roadway improvements. The project, identified as Project No. FM452566-1-52-01, involves improvements to SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, traffic separators, loops, and signage. The project is estimated to cost $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion, funded through DTPW's General Fund. The Transportation Committee forwarded the item to the BCC with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Pending BCC Assignment (Resolution approving agreement)
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Miami-Dade County and Florida Department of Transportation

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is considering approving an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements. The project, identified as Project No. FM452566-1-52-01, involves SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include sidewalk reconstruction, curb ramps, milling and resurfacing, widening, striping, and traffic separators. The project is estimated to cost $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Pending BCC Assignment (Resolution approving agreement)
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Florida Department of Transportation (FDOT) and Miami-Dade County

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is considering an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements along SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project, with an estimated cost of $5,900,000, will be funded and built by FDOT, with an anticipated construction start date of March 2027. Improvements include reconstruction of sidewalks, curb ramps, milling and resurfacing, widening, striping, traffic separators, and signage. The County will be responsible for maintenance operations upon project completion. The Transportation Committee forwarded the item to the Board with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road
Applicant:
Florida Department of Transportation (FDOT) and Miami-Dade County

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is considering an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for roadway improvements on SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, traffic separators, loops, and signage. The project is estimated to cost $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion. The Transportation Committee forwarded the item to the Board with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; pending Board of County Commissioners approval
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Florida Department of Transportation (FDOT) and Miami-Dade County

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is set to approve an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements along SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements involve reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, traffic separators, loops, and signage. The project is estimated to cost $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Recommended for approval by Transportation Committee, pending Board of County Commissioners approval
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Florida Department of Transportation (FDOT) and Miami-Dade County

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is set to approve an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for roadway improvements on SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project, with an estimated cost of $5,900,000, will be funded and built by FDOT, with construction anticipated to start in March 2027. Improvements include sidewalk reconstruction, curb ramps, milling and resurfacing, widening, striping, and traffic separators. Miami-Dade County will be responsible for maintenance operations upon project completion.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Approved (Resolution)
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road
Applicant:
Miami-Dade County and Florida Department of Transportation

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is considering an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for roadway improvements on SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project, which includes work on NW 74th Street Connector and NW 72nd Avenue, involves reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, a traffic separator, loops, and signage. The estimated cost is $5,900,000, funded and built by FDOT. The anticipated construction start date is March 2027. The Transportation Committee forwarded the item to the Board with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; pending Board of County Commissioners approval
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Florida Department of Transportation (FDOT) and Miami-Dade County

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is considering an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements. The project involves SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, milling and resurfacing, widening, striping, and a traffic separator. The project is estimated to cost $5,900,000 and will be funded and built by FDOT, with Miami-Dade County responsible for maintenance post-completion. The anticipated construction start date is March 2027. The Transportation Committee forwarded this item to the Board with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Florida Department of Transportation (FDOT) and Miami-Dade County

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is approving an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements on SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue. The project, with an estimated cost of $5,900,000, will be funded and built by FDOT, with construction anticipated to start in March 2027. Specific improvements include sidewalk reconstruction, curb ramps, milling and resurfacing, widening, striping, and traffic separators. The County will be responsible for maintenance operations upon project completion.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Approved (Resolution)
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including NW 74th Street Connector and NW 72nd Avenue
Applicant:
Florida Department of Transportation (FDOT) and Miami-Dade County

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is considering an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements along SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, traffic separators, loops, and signage. The project is estimated to cost $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon completion. The Transportation Committee forwarded the item to the Board with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; pending Board of County Commissioners approval
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Florida Department of Transportation (FDOT) and Miami-Dade County

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County is approving an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for roadway improvements on SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, milling and resurfacing, widening, striping, and a traffic separator. The project is estimated to cost $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Approved (Resolution)
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Miami-Dade County and Florida Department of Transportation

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is considering an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements on SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, curb and gutter, milling and resurfacing, widening, striping, traffic separators, loops, and signage. The project is estimated to cost $5,900,000 and will be funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Forwarded to BCC with a favorable recommendation by Transportation Committee; pending Board of County Commissioners approval
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Miami-Dade County and Florida Department of Transportation

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County is approving an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for roadway improvements along SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, milling and resurfacing, widening, striping, and traffic separators. The project is estimated to cost $5,900,000 and will be funded and built by FDOT, with Miami-Dade County responsible for future maintenance. The anticipated construction start date is March 2027. The Transportation Committee forwarded the item to the Board of County Commissioners (BCC) with a favorable recommendation.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Approved (Resolution)
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Miami-Dade County and Florida Department of Transportation

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is considering an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for roadway improvements on SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, milling and resurfacing, widening, striping, and a traffic separator. The project is estimated to cost $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon completion.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
In Committee
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Florida Department of Transportation (FDOT) and Miami-Dade County

OFF-SYSTEM AGREEMENT FOR LOCAL ROADWAY IMPROVEMENTS

Miami-Dade County Board of County Commissioners is approving an Off-System Construction and Maintenance Agreement with the Florida Department of Transportation (FDOT) for local roadway improvements on SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road. The project includes work on NW 74th Street Connector and NW 72nd Avenue. Specific improvements include reconstruction of sidewalks, curb ramps, milling and resurfacing, widening, striping, and installation of a traffic separator. The project is estimated to cost $5,900,000, funded and built by FDOT, with an anticipated construction start date of March 2027. Miami-Dade County will be responsible for maintenance operations upon project completion.

Board:
Transportation Cmte
Date:
2026-07-14
Type:
Resolution
Decision:
Approved (Resolution)
Address:
SR 934/NW 74th Street Connector from west of NW 77th Court to east of Red Road, including work on NW 74th Street Connector and NW 72nd Avenue
Applicant:
Miami-Dade County and Florida Department of Transportation

See the actual businesses behind these numbers

Get the real filings, with addresses and officers, free for 7 days. No credit card required.

Start your free trial