2) EDO - Gateway Logistics Center- County Earthwork Package Contract
Santa Rosa County is considering a contract for the Gateway Logistics Center project. The proposed contract is with Site and Utility, LLC, for an earthwork package valued at $1,947,979.00. This item is currently under review for approval. If approved, the project will involve significant site preparation, including earthwork and utility installation. This early stage presents an opportunity for contractors, suppliers, and service providers to engage. Businesses specializing in site clearing, grading, underground utilities, and related heavy construction services could find opportunities as the project moves forward. Early engagement before final bids and permits are set can provide a competitive advantage.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-19
- Type:
- Agenda_item
2) Environmental - Additional Blowers for MIP WWTP
Santa Rosa County is considering a change order for the MIP Wastewater Treatment Plant (WWTP). This change order, if approved, would add blowers to the plant. The project aims to increase the plant's capacity from 0.25 million gallons per day (MGD) to 0.5 MGD. This item is currently under review by the Commission Committee. The work would involve installing new equipment and potentially related utility connections. Contractors specializing in wastewater treatment plant equipment, mechanical systems, and potentially civil work could find opportunities. Reaching out to the county early could provide insight into the project's timeline and specific needs before formal bidding processes begin.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-19
- Type:
- Agenda_item
- Address:
- MIP WWTP
2) Environmental - Additional Blowers for MIP WWTP
Santa Rosa County is considering a change order for the MIP Wastewater Treatment Plant (WWTP). This change order, if approved, would add blowers to expand the plant's capacity from 0.25 million gallons per day (MGD) to 0.5 MGD. The proposed cost for this expansion is $50,830. This item is currently under review by the Commission Committee. If approved, the project would involve the installation of new equipment and potentially related utility connections. Contractors and suppliers involved in wastewater treatment equipment, installation, and related services could find opportunities. Early engagement before final permits and bidding may offer an advantage.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-19
- Type:
- Agenda_item
- Address:
- MIP WWTP
2) Minutes
Commission Committee Meeting listed this item on its agenda for 2026-05-19 in Santa Rosa County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-19
- Type:
- Agenda_item
2) Minutes
Commission Committee Meeting listed this item on its agenda for 2026-05-19 in Santa Rosa County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-19
- Type:
- Agenda_item
2) Minutes
Commission Committee Meeting listed this item on its agenda for 2026-05-19 in Santa Rosa County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-19
- Type:
- Agenda_item
2) Minutes
Commission Committee Meeting listed this item on its agenda for 2026-05-19 in Santa Rosa County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-19
- Type:
- Agenda_item
2) OMB - Point Baker Water System Subrecipient Agreement for FDEP Water Supply Grant
Santa Rosa County is reviewing a subrecipient agreement for a water supply grant. This project aims to support the construction of a new well capable of pumping 1,000 gallons per minute and a new elevated water tank with a capacity of 750,000 gallons. The agreement is currently under review by the Commission Committee. This project will likely involve site preparation, well drilling, tank construction, and the installation of related water system infrastructure. Local contractors, suppliers, and service providers in the utility and construction sectors may find opportunities as this project moves forward. Early engagement could be beneficial before final plans and permits are established.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-19
- Type:
- Agenda_item
2) OMB - Point Baker Water System Subrecipient Agreement for FDEP Water Supply Grant
Santa Rosa County is considering a subrecipient agreement for a water supply grant. This project aims to support the construction of a new well capable of pumping 1,000 gallons per minute and a new elevated water tank with a capacity of 750,000 gallons. The agreement is currently under review by the Commission Committee. If approved, this project would involve significant infrastructure development, including well drilling, tank construction, and the installation of associated water system components. This early stage presents an opportunity for contractors, suppliers, and service providers to engage. Businesses specializing in water system infrastructure, heavy construction, utility work, and material supply should consider reaching out to understand the project's scope and potential involvement before final plans and permits are established.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-19
- Type:
- Agenda_item
- Address:
- Point Baker Water System
2) UPCOMING May 21: Memorial Day
Commission Committee Meeting listed this item on its agenda for 2026-05-19 in Santa Rosa County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-19
- Type:
- Agenda_item
2) UPCOMING May 21: Memorial Day
Commission Committee Meeting listed this item on its agenda for 2026-05-19 in Santa Rosa County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-19
- Type:
- Agenda_item
2. 2026-5-V
A variance request is under review for a property at 6451 Mary Kitchens Road in Milton. The applicant, Daniel and Christina Odenthal, seeks to reduce the wetland buffer setback from 25 feet to 1 foot. This reduction is needed to allow for the construction of a single-family residence on land currently zoned AGRR (Rural Residential Agriculture). The request is currently under review by the Commission Committee Meeting. If approved, the project would involve site preparation for a single-family home, including clearing, grading, and utility connections. Specific challenges mentioned include a difficult build due to proximity to wetlands and the need for a septic tank mound system. Contractors specializing in residential construction, site preparation, plumbing, and potentially environmental consulting could find opportunities. Early engagement before final site plans and permits are issued may provide a competitive advantage.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-19
- Type:
- Agenda_item
- Address:
- 6451 Mary Kitchens Rd, Milton
- Applicant:
- Daniel & Christina Odenthal
2. 2026-9-RSS
A rezoning request for 15.5 acres at 2755 Bud Diamond Road in Jay is currently under review. The property is proposed to change from an AG2 (Agriculture District 2) zoning to AG1 (Estate Residential Agriculture) and from an AG (Agriculture) Future Land Use to AGER (Agriculture Estate Residential). This change is planned to allow for estate-style residential development. The Zoning Board has recommended approval for this rezoning. If approved, this project would likely involve site preparation, grading, utility installation, road and driveway construction, and final landscaping. Local contractors, suppliers, and service providers should consider reaching out to the applicants or relevant county departments to learn more about potential opportunities as the project moves forward, as early engagement can provide a competitive advantage before formal plans and permits are finalized.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-19
- Type:
- Agenda_item
- Address:
- 2755 Bud Diamond Rd., Jay
- Applicant:
- Robert & Jennifer Youngblood
2. Disclaimer. Except as expressly provided in the Services Agreement, Altumint
Commission Committee Meeting listed this item on its agenda for 2026-05-19 in Santa Rosa County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-19
- Type:
- Agenda_item
20) OMB - Budget Amendment 2026-045 MIP Waste Water Treatment Plant Loan Payment
Santa Rosa County is reviewing a budget amendment, number 2026-045, to use $1,018,000 from its General Fund reserves. This money is intended to cover the yearly loan payment for the wastewater treatment plant located at Milton Interchange Park. This item is currently under review by the Commission Committee. The project involves the financial allocation for an existing wastewater treatment facility's loan obligation. This process could lead to future needs for contractors and suppliers related to the plant's operation and maintenance. Businesses involved in utility services, construction, and financial services may find opportunities as the county manages its infrastructure funding. Early engagement with county officials could provide insights into upcoming project requirements.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-19
- Type:
- Agenda_item
- Address:
- Milton Interchange Park
3) Administration - Cancellation of Task Order ITB 23-038
This item concerns the cancellation of Task Order ITB23-038, which was previously approved for Panhandle Grading and Paving. The original approval for this task order was granted by the Board on November 13, 2025. This cancellation means that work associated with this specific task order will not proceed as planned. The cancellation is currently under review by the Commission Committee Meeting. This action means that any planned site clearing, grading, paving, or related underground utility work under this task order will not be undertaken at this time. Contractors, suppliers, and service providers interested in future opportunities should monitor upcoming agenda items, as this cancellation may indicate a shift in project plans or a re-evaluation of needs.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-19
- Type:
- Agenda_item
3) Administration - CareerSource Escarosa Interlocal Agreement
Commission Committee Meeting listed this item on its agenda for 2026-05-19 in Santa Rosa County. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-19
- Type:
- Agenda_item
3) County Administration - City of Milton Fireworks Funding Request
The City of Milton has requested financial assistance from Santa Rosa County for the upcoming 4th of July Riverfest event. The request is for $10,000.00 to support the event. This item is currently under review by the Commission Committee. If approved, the funding would contribute to the planning and execution of the fireworks display and related activities for the Riverfest. This early stage in the review process presents an opportunity for local businesses to engage with the City of Milton and Santa Rosa County regarding potential services or supplies needed for the event. Businesses specializing in event services, entertainment, or public safety could find opportunities by reaching out now, before final plans and contracts are established.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-19
- Type:
- Agenda_item
- Applicant:
- City of Milton
3) County Administration - City of Milton Fireworks Funding Request
The City of Milton has requested financial assistance of $10,000.00 from Santa Rosa County for the 4th of July Riverfest event. This request is currently under review by the County Commission Committee. If approved, the funding would support a community event. This item is early in the public process, offering an opportunity for local businesses to engage. While specific work is not detailed, event support often involves services like site preparation, vendor coordination, and public safety arrangements. Businesses specializing in event services, logistics, and potentially temporary infrastructure could find opportunities. Early engagement before final decisions are made allows businesses to understand the event's needs and potentially offer their services.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-19
- Type:
- Agenda_item
- Applicant:
- City of Milton
3) Environmental - Additional Treatment Train for MIP WWTP
Santa Rosa County is considering an addition to the MIP Wastewater Treatment Plant (WWTP). This project proposes to add a 0.250 MGD Treatment Train to expand the plant's capacity from 0.25 MGD to 0.5 MGD. The purchase is planned from KUBOTA Water & Environment USA (Pump & Process) for an estimated $1,170,000. This item is currently under review by the Commission Committee. If approved, the project would involve the procurement and installation of specialized water treatment equipment. This could lead to opportunities for contractors and suppliers involved in utility infrastructure, mechanical systems installation, and potentially site preparation if any physical expansion is required. Early engagement with county staff or the designated project lead could provide valuable insight into the project timeline and specific needs as plans develop.
- Board:
- Commission Committee Meeting
- Date:
- 2026-05-19
- Type:
- Agenda_item