4/15/26 VOPH Addendum Agenda
Villages of Pasadena Hills Planning and Policy Committee · 2026-04-15 · agenda
[37918 Meridian Avenue, Dade City, FL 33525 (Meeting Location)] Villages of Pasadena Planning and Policy Committee Addendum Agenda meeting on April 15, 2026. The committee considered multiple items including minutes approvals, a substantial modification to increase non-residential uses, a rezoning for an assisted living facility and office space, a comprehensive plan amendment, and a development agreement for a road construction project. Public comment details are not stated in this document. [case PDE26-0594, PDE26-0595, PDE26-0596, PDE26-0604] Approval of Annotated Minutes from previous Planning and Policy Committee meetings. File numbers PDE26-0594, PDE26-0595, PDE26-0596, and PDE26-0604 were recommended for approval. [North side of McCabe Road, approximately 1.25 miles east of Curly Road; case PDE26-7876] Substantial Modification to Evans C-1 MPUD to increase non-residential uses from 82,000 sq ft to 94,840 sq ft on approximately 52.08 acres. Located in Village C on the north side of McCabe Road, approximately 1.25 miles east of Curly Road. Recommended for Approval with Conditions. [North side of Prospect Road, approximately 0.5 miles east of Curly Road; case PDE26-7904] Rezoning Request from A-R Agricultural Residential to MPUD Master Planned Unit Development District for the development of 45,000 sq ft of Assisted Living Facility, 5,000 sq ft of Office, and one Single Family Detached Dwelling on approximately 7.66 acres. Located in Village B on the north side of Prospect Road, approximately 0.5 miles east of Curly Road. Recommended for Approval with Conditions. [case PDE26-0356] Comprehensive Plan Amendment to Goal FLU 6 Pasadena Hills, amending Tables PH-2 and PH-3 (VOPH Residential Conversion Charts) and a text amendment to Land Use Classifications: Village Mixed Use – 2. Recommended for Approve. [Hidden Creek Boulevard, Villages of Pasadena Hills; case PDE25-0193] Development Agreement for Highland Homes and Clayton Properties Group Inc. to design, permit, and construct a portion of Hidden Creek Boulevard in exchange for Transportation Development Fee Credits within the Villages of Pasadena Hills. Recommended for Approve.
Agenda items
- 1. 185 foot Westbound right tun lane
- 1. 245 foot Northbound left turn lane
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Building & Industrial Supply
- 1. 335 foot Westbound right turn lane
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Painting & Flooring
- General Contractor
- Building & Industrial Supply
- 1. PDE26-7876: Visuals
- 1. The Subject Site is currently vacant.
- 1. Timing and Phasing (T&P) and/or Substandard Road Analysis (SSRA): The PDE
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- 1. Two way left turn lane between Access D/E and F
- 10. For portions of the MPUD that are not required to be platted, the post-development Category
- Engineering & Architecture
- Legal Services
- Real Estate Development
- Landscaping & Lawn Service
- 11. The MPUD boundary contains Core Reserve. Policy FLU 6.2.1 and the Core Reserve Overlay
- Engineering & Architecture
- Landscaping & Lawn Service
- Site Prep, Grading & Hardscape
- 12. The final Core Reserve boundaries will be finalized at the time of site development submittal,
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Engineering & Architecture
- Building & Industrial Supply
- Real Estate Development
- 13. The developer (s) shall create mandatory homeowners'/property owners ’/condominium
- Legal Services
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- Site Prep, Grading & Hardscape
- Government Authority
- 14. If the LUEM is utilized to convert non-residential square feet to residential units (as expressly
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Carpentry & Cabinetry
- Roofing
- Painting & Flooring
- Drywall & Insulation
- Building & Industrial Supply
- Engineering & Architecture
- Legal Services
- Landscaping & Lawn Service
- 15. If the LUEM is utilized to convert non-residential square feet to residential units (as expressly
- Site Prep, Grading & Hardscape
- General Contractor
- Engineering & Architecture
- Real Estate Development
- Landscaping & Lawn Service
- 16. No internal landscape buffers shall be required to separate the proposed uses.
- 17. The required VOPH Transportation Analysis submitted by the applicant has been approved
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- 18. The entire project must be platted, or if platting is not required, all building permits must be
- 19. The initial phase of Handcart Road Ext., a VOPH Primary Roadway which is planned through
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Utilities (Sub)
- Building & Industrial Supply
- 2. 585 foot Eastbound left turn lane
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Building & Industrial Supply
- Engineering & Architecture
- 2. D evelopment shall substantially conform to the Binding Conceptual Commercial Site Plan
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- General Contractor
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 2. PDE26-7676: Exhibits A, B, and C
- 2. Pasco County Utilities (PCU): PCU identified that the development may need to extend utility
- Utilities (Sub)
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 2. The MPUD includes a Binding Concept Plan as depicted in attachment C.
- 20. Cross sections for internal streets located within the Village Center, but which are not VOPH
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- General Contractor
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- Landscaping & Lawn Service
- 21. All alternative transportation facilities, not along a Master Roadway Plan (MRP) roadway, which
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Painting & Flooring
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 22. The design, construction and use of any street or roadway authorized as a permitted road for
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Government Authority
- 23. Except as shown on Attachment B for the MPUD access to Handcart Road Extension, the
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Engineering & Architecture
- 24. An LDC variation is approved for Section 901.3.M. to not provide vehicular cross access to the
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- 25. The developer shall make the following improvements (all measurements include taper and
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- 26. All roads that will be used to access public-purpose sites, such as public school, park, library,
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Utilities (Sub)
- Building & Industrial Supply
- Engineering & Architecture
- 27. At each PDP/PSP approval, the County Engineer, or designee, may also require site- specific
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- 28. Unless otherwise determined at the time of PSP/PDP review through the appropriate review
- 29. Street connections and rights -of-way to adjoining areas shall be provided to give access to
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Engineering & Architecture
- Real Estate Development
- 3. 295 foot Southbound left turn lane
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- Construction (Other)
- Engineering & Architecture
- 3. If during construction activities any evidence of the presence of State or Federally protected
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Government Authority
- 3. PDE26-7876: Timing and Phasing
- 3. Pasco Sheriff’s Office (PSO): The PSO provided no objections to the proposed rezoning.
- 3. The applicant has agreed to dedicate an additional 10 feet of righ-of-way along the
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- 30. In the case of private streets, and any amenities within those rights -of-way such as paths,
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 31. The developer(s) shall convey at no cost to the County the required amount of right-of-way for
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Engineering & Architecture
- General Contractor
- Building & Industrial Supply
- 32. The developer(s) shall convey, at no cost to the County, ten (10’) feet of right-of-way along the
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 33. If, during construction activities, any evidence of historic resources including, but not limited
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Legal Services
- Government Authority
- 34. If the property to the east has an approved PDP/PSP or is built -out, then prior to PDP/PSP
- Engineering & Architecture
- Professional Services (Other)
- Site Prep, Grading & Hardscape
- General Contractor
- 35. Prior to the first PDP/PSP submittal, the developer(s) shall submit a Master Roadway Plan
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Construction (Other)
- Engineering & Architecture
- Building & Industrial Supply
- Government Authority
- 36. Street lighting is required throughout the MPUD pursuant to LDC Section 901.11.
- Electrical
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Government Authority
- 37. The developer s shall comply with the County and Pasco County Public Transportation
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- 38. The developer(s) shall submit an overall pedestrian/bike path plan to the PDE for approval
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Building & Industrial Supply
- 39. All sidewalks, bike paths (not including multipurpose paths, bike lanes or on- street parking
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Landscaping & Lawn Service
- 4. 245 foot Southbound right turn lane
- 4. Fire: Fire Services provided no objections to the proposed rezoning.
- 4. PDE26-7876: Public Notice
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 4. The applicant shall provide a 100% gopher tortoise burrow survey conducted according to
- Engineering & Architecture
- Business Consulting
- Site Prep, Grading & Hardscape
- Landscaping & Lawn Service
- Building & Industrial Supply
- 4. The subject parcel is located within Village C, a Type 2 Village. A Type 2 Village "permits
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- HVAC & Climate Control
- Plumbing
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Engineering & Architecture
- Landscaping & Lawn Service
- 40. As provided in Chapter 190, Florida Statutes, and subject to the BCC’s separate approval, the
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 41. A Master Utility Plan for the entire development shall be submitted to the Public Infrastructure
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- General Contractor
- 42. Prior to the first construction plan/construction site plan approval, the developer(s) and the
- Utilities (Sub)
- General Contractor
- Engineering & Architecture
- Building & Industrial Supply
- 43. The developer(s) shall construct all water and wastewater facilities within the development to
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- 44. The developer shall pay applicable utility connection fees and surcharges in accordance with
- 45. In consideration of Pasco County's agreement to provide potable water and/or reclaimed water
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- 46. The developer shall submit a Stormwater Management Plan and Report (SMP) for its portion
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- 47. The applicant shall contact the SWFWMD Engineering & Watershed Management Section for
- 48. At time of the first site development permit, the applicant shall comply with applicable County
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- 49. The applicant shall verify if the proposed project is within a Basin of Special Concern. If the
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- 5. Emergency Management: The Emergency Management department provided no objections to
- 5. PDE26-7876: Proof of Publication
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- General Contractor
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- 5. Suitable nest cavities for the Southeastern American Kestrel were observed within the project
- Engineering & Architecture
- Business Consulting
- Professional Services (Other)
- 5. The applicant has voluntarily agreed to the standard Live Local Condition.
- 50. All pass -through drainage and the finalized 100- year floodplain shall have an access and
- Engineering & Architecture
- Landscaping & Lawn Service
- 51. The non-residential and vertical mixed-use, only to the limited extent the LUEM conversions
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Engineering & Architecture
- 52. The maximum non- residential entitlements shall not exceed 94,840 square feet, subject to
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- 53. The LUEM may be utilized:
- 55. Non-Residential Design Standards
- 56. Non-Residential permitted uses are as follows:
- 6. If construction activities are to occur between January 1 to July 1, the applicant/applicable
- Engineering & Architecture
- Landscaping & Lawn Service
- Site Prep, Grading & Hardscape
- Construction (Other)
- 6. School District: The School Board identified that this development is subject to school impact
- 6. The applicant has agreed to follow any future commercial design standards approved by
- Engineering & Architecture
- Real Estate Development
- General Contractor
- 7. LDC Section 402.2.C.8 specifies that variations from this Code may be reviewed and
- Engineering & Architecture
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- 7. Parks, Recreation, and Natural Resources (PRNR): PRNR included comments that were
- 7. The upland buffer line shall be clearly field demarcated prior to any construction activities. No
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- 8. The SWFWMD-approved wetland boundary survey shall be submitted with the Preliminary
- Engineering & Architecture
- Business Consulting
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- 8. The proposed request is consistent with the Pasco County LDC, Chapter 400,
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Real Estate Development
- 9. A copy of the SWFWMD Environmental Resource Permit (ERP) shall be submitted to the
- Addendum
- All electronic devices must be turned off while in the Board Room.
- C1 Annotated Minutes - Villages of Pasadena Hills Planning and Policy
- C2 Annotated Minutes - Villages of Pasadena Hills Planning and Policy
- C3 Annotated Minutes - Villages of Pasadena Hills Planning and Policy
- C4 Annotated Minutes - Villages of Pasadena Hills Planning and Policy
- Historic Pasco County Courthouse
- I. Section 905.1.E Neighborhood Parks, Amount of Land Required, to reduce the total park
- Engineering & Architecture
- Site Prep, Grading & Hardscape
- Real Estate Development
- II. Section 905.1.F.2 Neighborhood Parks, Neighborhood Park Standards, Uses Prohibited, to
- Real Estate Development
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- III. Section 905.1.F.5.b, Neighborhood Parks, Neighborhood Park Standards, Open Play Areas,
- Real Estate Development
- Engineering & Architecture
- Legal Services
- Site Prep, Grading & Hardscape
- Landscaping & Lawn Service
- IV. Section 905.1.F.6, Neighborhood Parks, Neighborhood Park Standards, Minimum Size, to
- Real Estate Development
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Landscaping & Lawn Service
- PC5 Substantial Modification (Consent) - Evans C-1/Evans Properties, Inc
- General Contractor
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- PC6 Zoning Amendment (Consent) – Revilo Ranch MPUD/Clearwater
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Accounting & Tax
- Legal Services
- PC7 Comprehensive Plan Amendment (Consent) – CPAS25(13) Revilo
- Engineering & Architecture
- Real Estate Development
- General Contractor
- Building & Industrial Supply
- Landscaping & Lawn Service
- PC8 Development Agreement (Consent) – Highland Homes, Clayton
- General Contractor
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- Real Estate Development
- Building & Industrial Supply
- Utilities (Sub)
- S. ~ .. •···~GAN!,?/·•.?v,,,.. ~ ::: cf':• 0 0 • .. ~1) ~
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Building & Industrial Supply
- Real Estate Development
- V. Section 901.6.D.11 to not provide an interconnection to the property to the north.
- Site Prep, Grading & Hardscape
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Roofing
- Drywall & Insulation
- Windows, Doors & Glass
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- VOPH Addendum Agenda
- VOPH Addendum Agenda
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Building & Industrial Supply
- Engineering & Architecture
- Real Estate Development
- VOPH Addendum Agenda
- VOPH Addendum Agenda
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Villages of Pasadena
- Villages of Pasadena Planning and
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Drywall & Insulation
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- a. Commercial buildings adjacent to SR 52/McCabe Road and Handcart Road shall have
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Electrical
- Plumbing
- HVAC & Climate Control
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- a. Creditable MRP Improvements
- a. For multi -family (vertical apartments or condominiums only) parcels, the total
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Real Estate Development
- Engineering & Architecture
- a. In the event of production failure or shortfall by Tampa Bay Water (TBW), as set forth
- Legal Services
- Engineering & Architecture
- a. Public Properties shall not be considered benefited properties and shall not be
- a. To convert not more than 12,840 sf of retail uses to create a maximum of 300 Multi
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Carpentry & Cabinetry
- Electrical
- Plumbing
- HVAC & Climate Control
- Roofing
- Painting & Flooring
- Building & Industrial Supply
- Real Estate Development
- a. Trunk sewer lines and lift stations.
- a. With respect to Office, any PO-1 or PO-2 permitted use or conditional use; and
- b. For multi-family apartments or condominiums, clubhouses (including pools, cabanas,
- b. In the event that vertical mixed use is developed, shared parking between residential
- General Contractor
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- Painting & Flooring
- Plumbing
- HVAC & Climate Control
- Electrical
- Roofing
- Drywall & Insulation
- Carpentry & Cabinetry
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- b. Main potable water lines and non-potable water lines, if applicable.
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- b. No debt or obligation of such CDD shall constitute a burden on any Public Property.
- b. Non-Creditable Site Access Improvements
- b. Prior to the developer (s)/owner(s) selling water, Water Use Permits, or water -use
- Legal Services
- Government Authority
- b. To convert not more than 7,762 sf of retail uses to create a maximum of 120 hotel
- General Contractor
- Carpentry & Cabinetry
- Drywall & Insulation
- Electrical
- HVAC & Climate Control
- Lighting & Low-Voltage Systems
- Painting & Flooring
- Plumbing
- Restoration & Waterproofing
- Construction (Other)
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Cleaning & Janitorial
- Hotel & Lodging
- b. With respect to Retail Use, any C -1 (Neighborhood Commercial District) permitted
- Real Estate Development
- General Contractor
- Carpentry & Cabinetry
- Plumbing
- Electrical
- HVAC & Climate Control
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Building Materials & Garden Supply
- Retail (Other)
- Engineering & Architecture
- Legal Services
- c. Due to the limited geographic area designated within the MPUD for non- residential
- Site Prep, Grading & Hardscape
- Concrete & Masonry
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
- c. Hotel is a permitted use in the Village C village center.
- c. Sewage treatment facility locations, including discussion of the proposed method of
- Utilities (Sub)
- Site Prep, Grading & Hardscape
- Engineering & Architecture
- d. A single self-storage facility incorporating at least three stories and being urban in
- General Contractor
- Concrete & Masonry
- Site Prep, Grading & Hardscape
- Electrical
- Plumbing
- HVAC & Climate Control
- Painting & Flooring
- Roofing
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- d. Method of lighting for all nonlocal roads shall be submitted at the time of record plat
- d. The commercial area shall include one (1) public space for social gatherings which
- Site Prep, Grading & Hardscape
- Landscaping & Lawn Service
- Engineering & Architecture
- Design & Creative
- Building & Industrial Supply
- Concrete & Masonry
- Construction (Other)
- e. A Master Utility Plan shall include AutoCAD and PDF electronic files and hydraulic
- Engineering & Architecture
- Utilities (Sub)
- e. A single gas station is permitted in the Village C village center. In the case that a gas
- General Contractor
- Concrete & Masonry
- Electrical
- HVAC & Climate Control
- Painting & Flooring
- Plumbing
- Site Prep, Grading & Hardscape
- Building & Industrial Supply
- Real Estate Development
- Engineering & Architecture
- Landscaping & Lawn Service
- Waste Management
- Government Authority
- i. McCabe Road and Project Access A/St. Benedict Road
- i. The Type 142AA and Type 82AA roadway improvements for Handcart Road
- Site Prep, Grading & Hardscape
- Utilities (Sub)
- Concrete & Masonry
- General Contractor
- Engineering & Architecture
- i. The maximum size of the convenience store shall be 5,000 square feet.
- ii. Handcart Road Ext and Project Access D/E
- Site Prep, Grading & Hardscape
- General Contractor
- Utilities (Sub)
- ii. McCabe Road and Handcart Road Extension intersection (north side)
- ii. Section 907.1.G of the LDC shall be used to determine if additional parking is
- iii. Handcart Road Ext and Project Access D/E and F
- Site Prep, Grading & Hardscape
- General Contractor
- Building & Industrial Supply
- Engineering & Architecture
Follow this across meetings
Applicants and firms
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account