Browse City of West Melbourne civic records
Every published record for City of West Melbourne, newest first. Filter by board, year, or industry to jump straight to the records you want, and page through to reach the full archive.
1,187 records
15. What equipment do you own that Is available for the WORK? (Attach addltlonal sheets as necessary)
City Council listed this item on its agenda for 2026-05-05 in City of West Melbourne. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- City Council
- Date:
- 2026-05-05
- Type:
- Agenda_item
16. INSURANCE
This item concerns insurance requirements for a roadway surfacing, reconstruction, and preservation contract in St. Lucie County. The contractor selected for Bid No. 25-059 must provide specific insurance coverage, including general liability, business automobile liability, and workers' compensation. This is an administrative item related to an existing or upcoming contract, not a new project initiation. The work involves roadway surfacing, reconstruction, and preservation, which typically includes site preparation, paving, and potentially utility work. Contractors and suppliers involved in road construction and maintenance may find opportunities related to this contract. Early engagement with the county or the selected contractor could provide insight into specific needs and timelines.
- Board:
- City Council
- Date:
- 2026-05-05
- Type:
- Agenda_item
16. What equipment will you purchase for the proposed WORK?
City Council listed this item on its agenda for 2026-05-05 in City of West Melbourne. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- City Council
- Date:
- 2026-05-05
- Type:
- Agenda_item
17. DEFAULT; TERMINATION
City Council listed this item on its agenda for 2026-05-05 in City of West Melbourne. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- City Council
- Date:
- 2026-05-05
- Type:
- Agenda_item
17. What equipment wlll you rent for the proposed WORK?
This item concerns the City of West Melbourne's review of a proposed project. The specific details of the project, such as its location, size, or intended use, are not provided in the available information. The agenda item is currently under review by the City Council. The information available focuses on contractor requirements for bidding, including acknowledgments of bid truthfulness and drug-free workplace programs. This suggests potential future construction or service work, but the scope is not defined. Local contractors, suppliers, and service providers are encouraged to monitor this item's progress as details become available, as early awareness can provide an advantage in understanding potential future opportunities.
- Board:
- City Council
- Date:
- 2026-05-05
- Type:
- Agenda_item
18. NON-DISCRIMINATION
This item concerns a proposed contract for the City of West Melbourne. The contract will include non-discrimination clauses for contractors regarding employment practices. This is a planned item currently under review by the City Council. The work involves ensuring compliance with non-discrimination policies in hiring and employment terms. This opportunity is early in the process, before specific contracts are awarded. Local contractors, suppliers, and service providers should monitor this item for potential future contract opportunities related to city projects.
- Board:
- City Council
- Date:
- 2026-05-05
- Type:
- Agenda_item
180) One per four consecutive LOTs
The City of West Melbourne City Council is reviewing specifications for a planned road construction project. This project involves the construction of Superpave Asphalt Concrete pavement, with specific types including SP-9.5, SP-12.5, or SP-19.0. The work will include excavation, pulverization of existing materials, and recycling of bituminous paving. Materials testing, including gradation, Marshall stability, and density, will be required. The project is currently under review, indicating an early stage in the planning process. The scope of work will likely involve site preparation, grading, underground utility work, paving, and final surface treatments. Contractors, suppliers, and service providers in site preparation, paving, concrete, asphalt, and material testing could find opportunities. Engaging early, before final bid documents and permits are issued, offers the best chance to compete for this upcoming work.
- Board:
- City Council
- Date:
- 2026-05-05
- Type:
- Agenda_item
19. E-VERIFY/ VERIFICATION OF EMPLOYMENT STATUS
This notice concerns a requirement for contractors and subcontractors working with the City of West Melbourne. All contractors and subcontractors must register with and use the E-Verify System to confirm the work authorization of new employees. This rule applies to all new hires starting January 1, 2021. Subcontractors must provide an affidavit stating they do not hire unauthorized workers. The City will not award contracts to businesses knowingly employing unauthorized aliens. This is a compliance requirement for all future contracts with the City. Businesses that provide services or supplies to the City should ensure they are registered with E-Verify and can provide documentation of compliance. Early confirmation of this requirement can help secure future contract opportunities.
- Board:
- City Council
- Date:
- 2026-05-05
- Type:
- Agenda_item
2. All terms and conditions of the previous Agreement and Amendments, which are
The City of West Melbourne is considering a project to patch four sections of Doherty Drive. This work involves milling down two inches and installing two inches of new asphalt. The proposed work is planned and has been recommended for approval. The project will involve site preparation, including milling existing asphalt, followed by paving operations. Contractors specializing in asphalt paving and related site work may find opportunities. Reaching out to the city early in the process could provide an advantage before final bids and permits are settled.
- Board:
- City Council
- Date:
- 2026-05-05
- Type:
- Agenda_item
- Address:
- Doherty Drive
2. Asphalt Milling (327-70-5A) 2" Average De pth
This item concerns asphalt milling work for the City of West Melbourne. The project involves milling 2 inches of asphalt on average. The total estimated quantity for this work is 570 square yards. This item is currently under review by the City Council. The scope of work will involve specialized equipment for asphalt milling and potentially site preparation and cleanup. This early stage presents an opportunity for contractors and suppliers to engage with the city before final bids and permits are issued. Businesses specializing in asphalt paving, site preparation, and related material supply should consider reaching out to understand the project's specific needs and timelines.
- Board:
- City Council
- Date:
- 2026-05-05
- Type:
- Agenda_item
2. Date L n 1../ (I K
A civic agenda item is planned for review by the City Council of West Melbourne. This item concerns a project that is currently under review. The project's scope is not detailed in the provided information. As the item is in the early stages of review, contractors, suppliers, and service providers are encouraged to monitor future public notices for detailed project information. Early engagement with the project stakeholders, once details become available, could offer a competitive advantage.
- Board:
- City Council
- Date:
- 2026-05-05
- Type:
- Agenda_item
2. GENERAL DESCRIPTION OF WORK
The City of West Melbourne is planning roadway surfacing, reconstruction, and preservation work. This project is currently under review and is described in St. Lucie County Bid No. 25-059. The scope of work will involve preparing and resurfacing existing roadways. This could include tasks such as site clearing, grading, pavement repair, and final surfacing. Local contractors, trades, suppliers, and service providers are encouraged to learn more about this upcoming project. Engaging early, before final bid documents and permits are issued, can provide a competitive advantage.
- Board:
- City Council
- Date:
- 2026-05-05
- Type:
- Agenda_item
2. Graduated cylinder, 1,000 ml, or greater
City Council listed this item on its agenda for 2026-05-05 in City of West Melbourne. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- City Council
- Date:
- 2026-05-05
- Type:
- Agenda_item
2. Inform employees about the dangers of drug abuse In t_he workplace, the business's policy of
City Council listed this item on its agenda for 2026-05-05 in City of West Melbourne. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- City Council
- Date:
- 2026-05-05
- Type:
- Agenda_item
2. Initial Revenue Projections for 2026-2027.
The City of West Melbourne is currently in the early stages of its budget development process for the 2026-2027 fiscal year. This includes preliminary revenue forecasting, which will inform upcoming decisions on capital improvement projects and major infrastructure work. The city council will review proposed capital improvements and major sewer/water projects on June 2, 2026, followed by a review of the draft city operating budget and a five-year street maintenance plan on June 16, 2026. These discussions will lay the groundwork for potential future construction and maintenance projects. Local contractors, trades, suppliers, and service providers are encouraged to engage with the city early in this planning phase. Understanding the city's budget priorities and capital improvement plans as they develop can provide a significant advantage in positioning for future work as specific projects are defined, bid, and permitted.
- Board:
- City Council
- Date:
- 2026-05-05
- Type:
- Agenda_item
2. St. Lucie County Roadway Surfacing, Reconstructing, and Preservation Bid No. 25 -059, Executed
City Council listed this item on its agenda for 2026-05-05 in City of West Melbourne. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- City Council
- Date:
- 2026-05-05
- Type:
- Agenda_item
2. Test procedure identical with ASTM D-244-60 except that .02 Normal Calcium
City Council listed this item on its agenda for 2026-05-05 in City of West Melbourne. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- City Council
- Date:
- 2026-05-05
- Type:
- Agenda_item
20. PRODUCTS OR MATERIALS WITH RECYCLED CONTENT
City Council listed this item on its agenda for 2026-05-05 in City of West Melbourne. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- City Council
- Date:
- 2026-05-05
- Type:
- Agenda_item
21. FLORIDA PRODUCED LUMBER
City Council listed this item on its agenda for 2026-05-05 in City of West Melbourne. The posted record gives the item title and nothing else, so there is no site, no size and no applicant on file for it yet. Local businesses that want to follow it can open the official agenda link above and watch for the fuller write-up the body posts as the meeting gets closer.
- Board:
- City Council
- Date:
- 2026-05-05
- Type:
- Agenda_item
22. ASBESTOS-FREE MATERIALS
This notice concerns a contract requirement for the City of West Melbourne. Contractors working on city projects must not use any asbestos or asbestos-based fiber materials. This is a contract specification that applies to work performed under a city contract. The item is currently under review by the City Council. This requirement will affect all future city construction and renovation projects, impacting site preparation, general construction, and all finishing trades. Early engagement with city procurement and project managers is advised to understand specific contract details and upcoming project timelines.
- Board:
- City Council
- Date:
- 2026-05-05
- Type:
- Agenda_item
See the actual businesses behind these numbers
Get the real filings, with addresses and officers, backed by a 14-day money-back guarantee.
Create your account